Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                Acceptable Outcomes
      PO1                                                                 AO1.1
      Infrastructure activities establish in a location:                  Infrastructure activities are established on a site that is well
      (a)    relative to the infrastructure network it services;          located relative to any supply or distribution network.

      (b)    where opportunities for cost efficiencies and reduction in
                                                                          AO1.2
             environmental and social impacts are maximised; and
                                                                          Where practicable, infrastructure activities are co­located with
      (c)    with a high standard of accessibility for maintenance        another utility of a similar or compatible type.
             purposes and at times of emergency.
                                                                          AO1.3
                                                                          Infrastructure activities are located on a site that can be easily
                                                                          accessed for maintenance purposes or at times of emergency.

     Table 9.3.11.3 Criteria for assessment (part)
      Performance outcomes                                                Acceptable Outcomes

      Effects of Use
      PO2
      Sufficient separation distance is provided between               No acceptable solution provided
      Infrastructure activities and incompatible uses on the same site
      and neighbouring premises to maintain amenity for
      neighbouring uses.
      PO3
      Infrastructure activities have minimal effect on adjoining          No acceptable solution provided
      premises and on scenic amenity by way of noise, reflection,
      glare, or any other emission.

     Table 9.3.11.3 Criteria for assessment (part)
      Performance outcomes                                                Acceptable Outcomes

      Design requirements
      PO4
      The siting and design of buildings or structures associated with No acceptable outcome provided
      the infrastructure activity i s compatible with the setting and
      character of the local area.
      PO5
      Infrastructure activities are sited and designed to:                No acceptable outcome provided
      (a)    minimise adverse visual impacts beyond the boundaries
             of the site; and
      (b)    minimise adverse impacts on the amenity of nearby
             residential, community or other sensitive land uses.

      PO6                                                                 AO6.1
      Mechanical plant and equipment (including air conditioning          Plant and equipment are:
      equipment) are:                                                     (a)   setback at least 6 metres from any property boundary;
      (a)    positioned to minimise adverse impacts on the amenity              and
             of any adjoining sensitive land uses;                        (b)   screened by a 1.5 metre wide vegetated buffer of dense
      (b)    enclosed or designed and positioned to visually integrate          vegetation or fencing of 1.8 metre in height.
             with building and roof design; and
      (c)    appropriately screened.                                      OR

                                                                          AO6.2
                                                                          Plant and equipment are located within a building.
      PO7                                                                 AO7.1
      Solar farms or roof mounted photo­voltaic panels totalling over     Photo­voltaic solar panels are:


**FINAL DRAFT ­ Post Consultation 2019**                                                                                                     Page 2 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.