Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
PO1 AO1.1
Infrastructure activities establish in a location: Infrastructure activities are established on a site that is well
(a) relative to the infrastructure network it services; located relative to any supply or distribution network.
(b) where opportunities for cost efficiencies and reduction in
AO1.2
environmental and social impacts are maximised; and
Where practicable, infrastructure activities are colocated with
(c) with a high standard of accessibility for maintenance another utility of a similar or compatible type.
purposes and at times of emergency.
AO1.3
Infrastructure activities are located on a site that can be easily
accessed for maintenance purposes or at times of emergency.
Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Effects of Use
PO2
Sufficient separation distance is provided between No acceptable solution provided
Infrastructure activities and incompatible uses on the same site
and neighbouring premises to maintain amenity for
neighbouring uses.
PO3
Infrastructure activities have minimal effect on adjoining No acceptable solution provided
premises and on scenic amenity by way of noise, reflection,
glare, or any other emission.
Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Design requirements
PO4
The siting and design of buildings or structures associated with No acceptable outcome provided
the infrastructure activity i s compatible with the setting and
character of the local area.
PO5
Infrastructure activities are sited and designed to: No acceptable outcome provided
(a) minimise adverse visual impacts beyond the boundaries
of the site; and
(b) minimise adverse impacts on the amenity of nearby
residential, community or other sensitive land uses.
PO6 AO6.1
Mechanical plant and equipment (including air conditioning Plant and equipment are:
equipment) are: (a) setback at least 6 metres from any property boundary;
(a) positioned to minimise adverse impacts on the amenity and
of any adjoining sensitive land uses; (b) screened by a 1.5 metre wide vegetated buffer of dense
(b) enclosed or designed and positioned to visually integrate vegetation or fencing of 1.8 metre in height.
with building and roof design; and
(c) appropriately screened. OR
AO6.2
Plant and equipment are located within a building.
PO7 AO7.1
Solar farms or roof mounted photovoltaic panels totalling over Photovoltaic solar panels are:
**FINAL DRAFT Post Consultation 2019** Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.