Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                Acceptable Outcomes
      300m2 do not create glare nuisance to roads or surrounding          (a)    setback at least 20 metres from property boundaries;
      areas.                                                                     and
                                                                          (b)    screened by a 1.5 metre wide vegetated buffer of dense
                                                                                 vegetation on property boundaries, including tall trees.
                                                                          AO7.2
                                                                          Photo­voltaic solar panels are constructed of dark, light­
                                                                          absorbing materials and covered with an anti­reflective coating
                                                                          enabling as much light as possible to be absorbed and
                                                                          minimising glint and glare.


      PO8                                                                  AO8
      Infrastructure activities provide an attractive street front address Where located within urban boundaries:
      with unsightly elements screened from view by walls and              (a)  the use has front fences or walls designed and sited to
      landscaping.                                                              contribute to the attractiveness of the streetscape and be
                                                                                compatible with the existing streetscape character;
                                                                          (b)    front fences or walls are setback an average of 1 metre
                                                                                 and are articulated to provide visual interest by stepping
                                                                                 the design at a maximum of 5 metre intervals; and
                                                                          (c)    planting is provided between the road reserve and any
                                                                                 fencing, without creating an impediment for pedestrians
                                                                                 using the footpath.

      PO9
      The generation of spill light by development, avoids significant No acceptable outcome provided
      annoyance, discomfort, distraction or a reduction in the ability to
      see essential information.                                          Editor’s Note:­ Refer to Section 3 of AS4282 The Control of the
                                                                          Obtrusive Effects of Outdoor Lighting for advice in relation to the
                                                                          design, installation and maintenance of lighting.

     Table 9.3.11.3 Criteria for assessment (part)
      Performance outcomes                                                Acceptable Outcomes

      Safety and security
      PO10
      Infrastructure activities avoid or effectively manage emissions of No acceptable outcome provided
      light, noise, vibration or radiation beyond the site such
      that environmental nuisance to occupants or users of
      surrounding premises is not caused.
      PO11                                                                AO11
      Unacceptable risks to public safety are avoided.                    Public and unauthorised access is restricted.

     Table 9.3.11.3 Criteria for assessment (part)
      Performance outcomes                                                Acceptable Outcomes

      Environmental Management
      PO12
      Infrastructure activities are designed, constructed and operated No acceptable outcome provided
      in a manner that:
      (a)    minimises energy use and greenhouse gas emissions;
      (b)    minimises the use of water; and
      (c)    maximises the re­use and recycling of by­products
             associated with the operation of the utility.

      PO13


**FINAL DRAFT ­ Post Consultation 2019**                                                                                                Page 3 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.