Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                            Acceptable Outcomes
                                                                            they are mounted on;
                                                                      (d)   are camouflaged through the use of colours and
                                                                            materials which blend into the surrounding landscape or
                                                                            where mounted on a building are colour matched to their
                                                                            background, using non­reflective paint;
                                                                      (e)   are positioned to minimise clutter of multiple facilities;
                                                                      (f)   are at least partially screened by vegetation; and
                                                                      (g)   in activity centres are positioned and designed to be less
                                                                            visible by pedestrians.

                                                                      AO16.3
                                                                      Except where co­located with an existing telecommunications
                                                                      facility, telecommunications facilities are located at least:
                                                                      (a)   400 metres from a residential activity;
                                                                      (b)   500 metres from any childcare centre, community care
                                                                            centre, educational establishment or park;
                                                                      (c)   20 metres from any public pathway; and
                                                                      (d)   1 kilometre from any other existing or approved
                                                                            telecommunications facility.

                                                                      AO16.4
                                                                      The height of a tower does not exceed:
                                                                      (a)   20 metres where within the Urban boundaries; and
                                                                      (b)   25 metres where outside of the Urban boundaries.

                                                                      AO16.5
                                                                      Where co­located with another existing telecommunications
                                                                      facility the height of a tower does not exceed:
                                                                      (a)   25 metres where within the urban boundaries; and
                                                                      (b)   30 metres where outside the urban boundaries.


      AO17                                                            AO17
      Telecommunication towers do not cast shadows such that the      For proposed buildings or structures having a height exceeding
      amenity of surrounding premises or usability of public open     8.5 metres above ground level and a cross­sectional area
      space is unreasonably reduced.                                  exceeding 20m2, shadowing does not affect residential lots,
                                                                      childcare centres or public open space to the extent of more
                                                                      than 20% of their site area for a period in excess of three hours
                                                                      on any day of the year.
      Health and safety
      PO18                                                            AO18
      The obtrusiveness of lighting is minimised without              Telecommunication facilities are designed and operated to
      unreasonably limiting the use, enjoyment or safety of outdoor   restrict human exposure to electromagnetic radiation in
      recreation facilities.                                          accordance with industry standards and best practice.

                                                                      Editor's note­ compliance with Radio Communications
                                                                      (Electromagnetic Radiation – Human Exposure) Standard
                                                                      2003 and Radio Protection Standard for Maximum Exposure
                                                                      Levels to Radiofrequency Fields, as updated from time to
                                                                      time, would be expected as a minimum.
      PO19                                                            AO19.1
      Telecommunication facilities are not publicly accessible.       Security fencing is provided to prevent unauthorised entry to the
                                                                      telecommunications facility.



**FINAL DRAFT ­ Post Consultation 2019**                                                                                            Page 5 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.