Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                              Acceptable Outcomes
                                                                        AO19.2
                                                                        Safety and warning signage are displayed where necessary.
      Co­location
      PO20                                                              AO20
      Telecommunication facilities are designed to facilitate the co­   The structural elements of the telecommunications facility are
      location with other telecommunications facilities.                designed to support co­masting or co­sting with other carriers.

     Table 9.3.11.3 Criteria for assessment (part)
      Performance outcomes                                              Acceptable Outcomes

      Utility Installation ­ Electricity Transmission Lines
      Effects of Use
      PO21
      Electricity transmission line easements are managed to            No acceptable outcome provided
      ensure:
      (a)   the continuation of the transmission of bulk electricity;
      (b)   safety and amenity for residents, occupiers and land
            uses in close proximity;
      (c)   natural environmental values are not adversely impacted
            upon; and
      (d)   the Shire’s visual and landscape qualities are not
            adversely impacted upon.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 6 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.