PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT                             10 SEPTEMBER 2024


               ATTACHMENT 2 – (51988.2770.02) – ADVISORY NOTES


     Building and Construction Industry (Portable Long Service Leave) Levy
1.   The QLeave levy must be paid prior to the issue of a development permit where it is required.
     Council will not be able to issue a Decision Notice without receipt of details that the Levy has
     been paid.
     Demolition
2.   All building materials containing asbestos products are wrapped and disposed of in
     accordance with the Public Health Regulation 2018 and the Environmental Protection
     Regulation 2019.
     NOTE: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
     businesses that transport asbestos waste, and landfills that accept this waste.
3.   Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
     requires a licensed asbestos removalist to give notice to Workplace Health and Safety
     Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
     commences. Notification must be made using Form 65: Notification of licensed asbestos
     removal work, demolition work or emergency demolition.
4.   The ‘Plumbing and Drainage Regulation 2019’ states that at demolition or removal of a
     building requires the existing sanitary drain upstream from the connection point for a service
     provider’s sewerage system must be sealed water tight. This work is deemed as Notifiable
     Work and must be carried out by a suitably licenced plumber who shall submit an As
     Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
     Construction Commission) within 10 days of completing the work.
5.   The ‘Plumbing and Drainage Regulation 2019’ states work necessary for installing, replacing
     or removing a testable backflow prevention device is included work for Notifiable Work.
     Removal must be carried out by a suitably licenced plumber who shall submit a Form 9
     (Registration & Report on Inspection and Testing of Backflow Prevention Devices) and Form
     4 (Notifiable Works Form) to the QBCC (Queensland Building Construction Commission)
     within 10 days of completing the work. Notification to Council once works and document
     submission is complete allows removal of backflow prevention devices from Council’s
     backflow register.
6.   All activities associated with the removal or demolition must be contained within the property
     boundaries at all times with site gateways opening inwards and at approved locations only.
     If the works cannot be contained within the site, a road and footpath permit must be applied
     for.




                                                                                        Page 1 of 1
Log in to download the original file

ATTACHMENT 2 - (51988.2770.02) - PROPOSED ADVISORY NOTES.pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.