ORDINARY MEETING MINUTES 17 FEBRUARY 2022
d. The proposed 25 litre pot size feature trees within the front setback (facing
Doonella Street) must be replaced with 45 litre pot size plants (the SYZ hem,
CUP ana, ELA ret, ACR imp species)
e. The existing street trees in the road reserve may be removed. If removed
they must be replaced with 4 x ex-ground Delonix regia (poinciana’s) as
shown on the approved operational works landscape plans.
56. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
Signage
57. Advertising devices must comply with Council’s signage policy.
OPERATIONAL WORKS - OPW21/0031
Approved Plans
58. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SD02 12 Ground / Carpark Plan, prepared by Archicology P/L 08/07/2021
A6035/21/EW01 F Earthworks Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R01 F Roadworks Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R03 E Roadworks Doonella Street – Cross Sections, prepared 25/05/2021
by Alta Engineering
A6035/21/R04 B Roadworks Setout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R08 A Roadworks Boundary Cross Sections, prepared by Alta 25/05/2021
Engineering
A6035/21/D01 E Stormwater Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/D02 E Stormwater Drainage Details, prepared by Alta 25/05/2021
Engineering
A6035/21/D03 B Stormwater Drainage Setout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/WQ01 E Stormwater Treatment Catchment Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/WQ02 E Stormwater Quality Layout Plan and Notes, prepared by 25/05/2021
Alta Engineering
A6035/21/WQ03 E Stormwater Quality Bio Basin Calculations and Details, 25/05/2021
prepared by Alta Engineering
CD-001 J Vegetation Management Plan, prepared by Project Urban 2021.05.28
CD-002 L Landscape Plan – In Ground, prepared by Project Urban 2021.05.28
CD-003 K Landscape Plan – In Ground, prepared by Project Urban 2021.01.25
CD-004 I Landscape Plan – On Podium, prepared by Project Urban 2021.01.25
CD-005 I Landscape Plan – Boundary Fences, prepared by Project 2021.01.25
Urban
CD-200 L Construction Details, prepared by Project Urban 2021.01.25
CD-201 C Planting Schedule, prepared by Project Urban 2021.01.28
CD-202 B Planting Schedule, prepared by Project Urban 2021.07.07
CURRENCY PERIOD
59. The Currency Period for this development approval lapses if the development has
not substantially started by 17 February 2024, unless an application to extend the
currency period is approved by Council.
Page 20 of 33