ORDINARY MEETING MINUTES 17 FEBRUARY 2022
PRIOR TO COMMENCEMENT OF WORKS
Engineering
60. All necessary approvals from external service providers (e.g. Unitywater) and
external parties on which the development works are proposed have been
obtained and a copy supplied to Council.
61. A condition report of the drainage system must be completed for agreement prior
to the prestart meeting. The condition report is to include a CCTV inspection of the
existing pipe and must include at least 50m upstream and downstream of all works.
62. A condition report including photographs of the frontage of the site must be
completed and submitted to council prior to the prestart meeting.
63. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart
meeting.
64. Council must be contacted at least 5 working days prior to any works commencing
to organise a prestart. The contact number to arrange a pre-start meeting is 5329
6500. The pre-start meeting must include the relevant parties for the following
aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
65. A Construction Management Plan must be submitted to Council prior to the pre-
start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site
both during daily construction and after daily construction has ceased;
iii. Proposed fencing to the site during the construction phase of the
development;
iv. Adequate parking arrangements for construction workers;
v. No queuing of trucks is permitted on residential streets, especially prior
to 7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures;
c. Provision for safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased;
d. Works programme identifying key components of the works and their
respective durations;
e. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues;
Page 21 of 33