ORDINARY MEETING MINUTES 17 FEBRUARY 2022
f. Include a post out to the local residents and businesses advising of the
proposed development, the expected time frames and the site contact
details.
g. Include signage in prominent locations on the boundaries of the site advising
of the proposed development, the expected time frames and the site contact
details;
h. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures;
i. For haulage operations involving significant volumes of excavated material
being transported off the site: details on the location of external site, the
haulage route, type of vehicle to be utilised during excavation operations and
frequency of usage. NB any damage to the existing road system as a result
of haulage operations must be fully repaired at the applicant’s expense.
66. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
67. Any conflict between the development and an existing or proposed service must
be referred to the relevant service authority for determination prior to
commencement of works.
DURING CONSTRUCTION
Engineering
68. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all works conform to the Operational Works
permit. Where municipal works are involved, such confirmation must be submitted
for the respective hold points prior to any site inspection by Council Officers.
69. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision
Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines;
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland” for
all water quality devices to be constructed on site.
Roadworks
70. The installation and/or modification of any traffic signs, street signs, line marking
and Raised Reflective Pavement Markings (RRPMs) must be in accordance with
the Manual of Uniform Traffic Control Devices (MUTCD). New or relocated
signage must be installed using the VLok installation system. All new signage must
be Class 1 retroreflective material in accordance with AS 1906.1, Retroreflective
materials and devices for road traffic control purposes – Part 1: Retroreflective
sheeting.
71. The developer must notify Council’s Traffic Engineer for any works involving the
removal or modification of existing council traffic signs and/or parking bays prior to
such works commencing.
Page 22 of 33