Original source · versioned page text
2022-02-17 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 17 FEBRUARY 2022
80. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed
asphaltic concrete or patterned/plain concrete;
b. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties;
c. Where there is an existing pedestrian path, a matching crossfall must be
provided for the driveway on the alignment of the path, for the full width of
the path;
d. The property accesses must be located a minimum of 1m clear of existing
power poles, streetlights or other signage. The developer is responsible for
any necessary relocation of existing services to provide this clearance and
must contact the relevant service authorities and comply with their
requirements in relation to these works.
Earthworks and Retaining Walls
81. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical testing undertaken in accordance with Section 8 of the Standard, and
to a minimum of ‘Level 2’ as defined in Appendix B. Test results as required by AS
3798, and a certificate of quality and uniformity of fill must be provided by a RPEQ
and submitted to Council prior to Council undertaking the On-Maintenance
inspection.
82. Fall protection must be provided to retaining walls that are over 1m high.
83. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas;
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
84. Appropriate scour protection must be provided at the outlet of all stormwater pipes
including temporary outlets.
85. Works associated with this permit must not adversely impact on the existing
drainage conditions on other properties (e.g. by blocking or interfering with natural
overland flows).
86. Construction of all internal stormwater drainage works must comply with the
relevant section/s of Australian Standard AS/NZS 3500.3.
Landscaping
87. The development site must be landscaped. The works must be undertaken in
accordance Noosa Plan PSP 2 – Landscaping and generally in accordance with
the approved Landscaping Plans and in particular:
a. The along the south side of the easement must include native species that
effectively screen the development and grow to a minimum mature height of
8m.
b. Plantings along the eastern side of the bio basin must grow to a minimum
height of 4m and provide screening to the car parking area.
Page 24 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.