Council archive · source document
15385_Town Planning Report_230216 · MCU16/0018
Attached to the e-mail MCU16/0018 Development Application - 9 Duke Street Sunshine Beach.
Specific Outcomes Probable solutions Proposal
with the following minimum
AND storage capacities—
a) Where no more than 3
O5 On-site water storage is bedrooms – 45,000 litres; or
adequate for occupants every b) Where more than 3
day use and fire fighting bedrooms – 60,000 litres;
purposes. AND
c) There is to be on the lot a
dam, swimming pool or water
tank accessible for use by the
fire brigade that contains at
least 5,000 litres of water.
Advisory note
The 5,000 litres required can be
included within the water
required in S4.2 or S5.1
providing it is accessible for the
purpose of fire fighting at all
times and not used for other
domestic purposes.
Erosion and sediment control No solution provided. Complies
O6 Development does not Appropriate erosion and
cause erosion or result in Advisory Note sediment control measures will
transport of sediments off-site. Persons undertaking be applied to ensure the
development, including building development does not cause
work, are required under the erosion or result in transport of
Environmental Protection sediments off-site.
(Water) Policy 1997 (EPP) to
ensure that sediment and other
material including building
waste, sawdust, concrete,
cement or paint are not
deposited or released into a
roadside gutter, stormwater
drain or waterway, or into a
place where it could reasonably
be expected to move or be
washed into a roadside gutter,
stormwater drain or waterway
and are not washed from the
site. Council enforces the EPP
and penalties may apply.
Safety and security S7.1 The building entrance is Alternative Solution
O7 For Multiple Housing clearly identifiable and visible Refer to section 6.4.1 of report.
Types 2, 3 and 4, buildings and from the street, footpath and
outdoor spaces are designed to driveway;
protect the personal security AND
and safety of residents by
allowing for natural surveillance. S7.2 The internal path network Alternative Solution
has clear sightlines to the Refer to section 6.4.1 of report.
dwelling entry and street access
points;
AND
S7.3 Visitors have direct access Complies
to the entrance without passing Direct visitor access to the entry
through private outdoor living of each unit on the ground floor
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15385_Town Planning Report_230216.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.