NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 14
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
67. A registered easement in favour of Council shall be created over any overland flow path within the site
that conveys stormwater from a Council road. The easement shall extend the full length and width of the
“1 in 100 year“ major storm event surface flow path and be created at no cost to Council.
68. A registered easement in favour of Council shall be created over any stormwater drainage pipes within the
site that convey stormwater from any adjoining property (for example, where drainage pipes are provided
within the site to prevent adjacent properties from additional ponding/flooding due to the subject site being
filled). The easement is to be centrally located over the pipework with a minimum width of 1.5m or be of
sufficient width to ensure all associated pits and pipes are wholly contained within the easement. The
terms of the easement shall include the responsibilities on the beneficiaries of the easement to maintain
the drain so as to be operational at all times.
69. A registered easement shall be created over any service conduit, pipe, pole or other structure that is
located within proposed Lot 1 and provides services to proposed Lot 2. The minimum width required for
an easement shall be in accordance with the guidelines of the relevant authority.
70. No building or other structure shall be constructed such that it encroaches over an easement.
71. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of
Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
endorsing of the Plan of Survey.
72. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles
Office forms or requisitions requiring the consent of Council being attended to forthwith.
Earthworks
73. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
This may require the design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on
the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall
not apply.
74. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
structures and/or lands that border the development site. Fences that are affected shall be replaced prior
to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
shall be clearly shown on the plans submitted for Operational Works approval.
75. Any fill material imported to the site (if any) must be from a site licensed with the Environmental Protection
Agency or from a site for which a Development Permit for Operational Works has been issued approving
the export of fill.
76. A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
placing additional fill, prior to such fill being placed.
Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the
existing levels within the subject lot. Batters shall be at a maximum grade of 1:4 unless retained by a wall.
Any existing fill or natural materials on the site which do not satisfy the Manager - Land Development's or
a Geotechnical Engineer's requirements shall be removed and replaced with suitable material.
77. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that
all lots have been compacted to the required standard.
Any existing fill on the site that does not comply with Council’s requirements shall be removed at the
direction of the Manager - Land Development prior to additional filling works commencing.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@5008a612\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156A98.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.