NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 14
Sewer Mains
56. Each lot shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
57. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council.
58. The existing sewer main that traverses the site adjacent to the eastern boundary and the ‘zone of
influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
all plans submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant shall amend
Operational Works plans including Building plans to ensure compliance.
Town Water Supply
59. Each lot shall be connected to Council’s existing town water supply and be constructed in accordance
with Council’s standards and requirements at no cost to Council.
60. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
61. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
62. Any connection to a water main shall be undertaken by Council.
Power/Telecommunications Services
63. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
(prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
lots.
64. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
new telephone services to the proposed lots. In this regard written confirmation from an approved
telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
Survey.
65. Any alteration of a public utility or other facility necessitated by the development of the land or associated
construction works either internal or external to the site shall be at no cost to Council.
Service Easements (Sewer / Water / Stormwater / Power / Telecommunications)
66. A registered easement shall be created over the zone of influence of all sewers within the subject site and
over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
accurately locate all sewer mains and determine the necessary width of the easement, which shall be
shown on any plans submitted for Operational Works and Building Works approval. To this extent the
surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@5008a612\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156A98.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
Decision Notice - 010.2007.00000070.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.