Original source · versioned page text
SCG 31084-C Issue 1 10.05.21 brian st
Attached to the e-mail Operational Works Application OPW21/0247 - DA Form 1 - Plan - 46 Bryan st Sunshine beach Excavation and Crossover.
Unit 1/11 Project Ave,
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
Noosa Heads
Design: TH
.
Date
31084 - C1
.
ABN 40 098 481 899
Drawn: TH
SUNSHINE BEACH
EXISTING SURVEY
Drg No.
46 BYRAN ST
55.2
5
Description
55.50 //
Date: May 2021
// // // //
55.25
55.25
.
55
Checked:
Issue:
.7
Project
Revision
5
56
Title:
Floor Level
.0
0
RL 57.998 DEBUILD T/A
.
Rev. - 10.06.16
Existing Block Wall
56
.2
5
Garden
Floor Level
RL
5
.2
40.234
56 Roof Peak
53°30'
RL Roof Peak
RL
55
.25
40.234
0
233°30'
Overhead
.0
56
Connection Floor Level
RL
75
55.
50
55.
55
Pavers
.25
55.25 5
Existing Rendered Retaining Wall Step
.2
55
Existing Brick Retaining Wall
Existing Brick Wall
Existing Timber Sleeper Retaining Wall
54.25
54
.2 5 54.
50
54
.00
53
.75
53
.50
Trees
53
.25
53
.00
52
.75
52.
50
52.2
5
Existing Rock Retaining Wall
52.00
51.
75
Existing Brick Retaining Wall
51.5
0
51.25
51.00
50.75
50.50 143°30'
15.088
Existing Rendered Block Wall
50.25
50.00
W
49.75
Power Pole
#31609
49.50
Sewer M/H
RL
49.25
Outlet IL AHD RL / m Outlet IL
Roofwater TBM Nail in Kerb Roofwater
Sewer M/H
RL
Bryan Street
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
Power Pole
#31609
55.25
54
5 2.
52.
52
53
53
54
53
53
.25
.75
.00
.2
.50
.75
.00
25
50
56
5
55.
50.50
50.75
.0
55.
0
50
75
Trees
54.
50
53°30'
40.234
55
.25
50.25
51.25
51.00
54.25
Connection
51.5
Overhead
51.
75
0
W
PROPOSED
52.00
Bryan Street
BUILDING
RL
Sewer M/H
55
.25
RL
Floor Level
RL
Sewer M/H
15.088
143°30'
49.25
40.234
49.50
233°30'
55
50.00
.2
49.75
5
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: EARTHWORKS & PILING PLAN
Project 46 BYRAN ST
SUNSHINE BEACH
Date: May 2021 Drawn: TH Design: TH
Drg No.
Rev. - 10.06.16
Checked:
31084 - C2 .
Page 3
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: EARTHWORKS & PILING DETAILS
Project 46 BYRAN ST
SUNSHINE BEACH
Date: May 2021 Drawn: TH Design: TH
Drg No.
Rev. - 10.06.16
Checked:
31084 - C2.2 .
Page 4
Power Pole
#31609
55.25
54
52.
52.
52
53
53
54
53
53
.25
.75
.00
.25
.50
.75
.00
25
50
56
55.
50.50
50.75
. 00
55.
50
75
Trees
54.
50
53°30'
40.234
55
.25
50.25
51.25
51.00
54.25
Connection
51.5
Overhead
51.
75
0
PROPOSED
W
52.00
Bryan Street
BUILDING
RL
Sewer M/H
55
5 .2
RL
Floor Level
RL
Sewer M/H
15.088
143°30'
49.25
40.234
49.50
233°30'
55
50.00
.2
49.75
5
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: DRIVEWAY & CROSSOVER PLAN
Project 46 BYRAN ST
SUNSHINE BEACH
Date: May 2021 Drawn: TH Design: TH
Drg No.
Rev. - 10.06.16
Checked:
31084 - C3.1 .
Page 5
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: DRIVEWAY SECTION & DETAILS
Project 46 BYRAN ST
SUNSHINE BEACH
Date: May 2021 Drawn: TH Design: TH
Drg No.
Rev. - 10.06.16
Checked:
31084 - C3.2 .