Original source · versioned page text
SCG 31084-C Issue 1 10.05.21 brian st
Attached to the e-mail Operational Works Application OPW21/0247 - DA Form 1 - Plan - 46 Bryan st Sunshine beach Excavation and Crossover.
Power Pole
#31609
55.25
54
5 2.
52.
52
53
53
54
53
53
.25
.75
.00
.2
.50
.75
.00
25
50
56
5
55.
50.50
50.75
.0
55.
0
50
75
Trees
54.
50
53°30'
40.234
55
.25
50.25
51.25
51.00
54.25
Connection
51.5
Overhead
51.
75
0
W
PROPOSED
52.00
Bryan Street
BUILDING
RL
Sewer M/H
55
.25
RL
Floor Level
RL
Sewer M/H
15.088
143°30'
49.25
40.234
49.50
233°30'
55
50.00
.2
49.75
5
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: EARTHWORKS & PILING PLAN
Project 46 BYRAN ST
SUNSHINE BEACH
Date: May 2021 Drawn: TH Design: TH
Drg No.
Rev. - 10.06.16
Checked:
31084 - C2 .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.