Council archive · source document
109 Gympie Terrace Noosaville APPLICATION · MCU16/0103
Attached to the e-mail MCU16/0103 & OPW16/0199 Development Application - 109 Gympie Terrace Noosaville.
Issue:
DEBUILD T/A
SCG
ABN 40 098 481 899
Title:
Project
Date: Scale: Drawn:
Drg No.
[OCR of page images]
DRAWING SIZE - Al
KE
= 2 = z= 8
a x = Ee EE S EX. SWPT EXISTING STORMWATER PIT
S bu 2 & e ao RC. HW. REINFORCED CONCRETE HEADWALL
= © S Ss EX. SMH — EXISTING SEWER MANHOLE
RL=2.24 os AP es . © re & E.0.B. EXISTING EDGE OF BITUMEN
4 K&C EXISTING KERB & CHANNEL
XN N.S.L. NATURAL SURFACE LEVEL
-_-_s+$_ FH. FIRE HYDRANT
| +L | »® we a 4 TP TELSTRA PIT
< x a EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
—~ RL=0.00
ne
LOT 5 ON RP 79817 € € E E & =
Level Datum AHD S re 5 10 oO ae
Level Origin PSM??922, RL 2222m S wl ~ a = N
Elizabeth St s s Ss S 3 S
1.00 -- 2.50 -- 4.80 -- 2.23 -- 1.99 -- —
& 2 9 co S iS
a E ~ < ~ v
a iS — = | & 7 5&1 &
N D> | — N — >)
ay S — = = —
—N
DRIVEWAY LONG SECTION
6
ANS ag
Od AN
150 KERB TO DETAIL WAN ROP Gg
<x AS
vd Sl 150 KERB TO DETAIL, 1 > oN ye = Ly
Ts = - * o
* 19955 FALL 2.225 J SY _ 3
NM ms 1 1:200 No 7 Sy Ce
IS , = ww S EXISTING FOOTPATH
- S pskY> =>
oe . HL a] w& 2 W\ |x SS
4 99N 1 \ <<
[ 2.255 | -ZZU To. \ al
| alezeal mA Ef 4) | ay \ 5 ——CUT & REMOVE EXISTING
—* ©, PATH DURING CONSTRUCTION
© & REPAIR AND REPLACE | | l
| x" GARAGR RL 2.240 | [ 2.220 | | Ke
TO os) |= ps] 2
Ie =| ____| DRIVEWAY CROSSOVERS IN
o j ACCORDANCE WITH IPWEA
a STD DRG R-0050 AND Uy
{ COUNCIL REQUIREMENTS
Sl PROPOSED 4 & IN —
—, _—— : =
Sl DUPLEX 5S | Q
mS , = {
] Ww
~ '
ARN S
j GARAGR RL 2.240 % ____REMOVE EXISTING
DRIVEWAY CL CROSSOVER MAKE GOOD
KERB AND CHANNEL
x x
4
| 2.259 i 564 \
— / © 2 Ae (Hm ‘ &,
| 4 . EE
A ‘ 1 \ (
: (225 ‘at yt | SS
KO
G =
P ww
SITE PLAN — DRIVEWAY & ACCESS
Scale 1: 100
LEGEND
INDICATES EXISTING SURFACE
9.00 CONTOUR AND LEVEL TO AHD.
125 THK. DRIVEWAY SLAB ON
COMPACTED MATERIAL, SL82 MESH,
TOP 50 COVER, FLEXIBLE JOINT
AGAINST MASONRY/CONCRETE.
aries — “ 23 S182 MESH (T.J.) DENOTES WET TOOLED JOINT TO
40 se 1000 MIDDLE ~~~ TERRACE SLAB, REFER 10 DETAILS
— €
oe oREWAY SLAB 5 8 of _ \ Ly (Ks) DENOTES FORMED KEY JOINT 70
125mm THK s Ae ee DRIVEWAY SLAB, DETAIL TO DETAILS
3 SL82 MESH WET TOOLED ~ ———— ee = Te py
smmrun ft ~ e 40mm TOP COVER CONTROL JOINT. fe YY LZ Z “ SUBGRADE PREPERATION, REFER TT ae - = \ g FALL. INDICATES DIRECTION OF FALL UP
moc] 8 [Ti 74 GENERAL NOTES OWM OR DOWN AS INDICATED
4 12 DEPTH DETERMINED COMPACTED
wi F ee SS ON-SITE SAW CUT AND SAND BED x INDICATES PROPOSED FINISHED
LEV LI Pyzemm NSO CONGRETE PAVEMENT, SLB? MESH MDDLE BACK OF KERB BARRIER, SEMI-MOUNTABLE, MONTABLE SURFACE LEVELS
150 CLLLLLLL LLL LOWER SLAB MESH 0 ~100 THK COMPACTED BASE COURSE SAND OR CRUSHER DUST KERB & CHANNEL OR INVERT CROSSING
MAINTAIN 40mm TOP COVER SEOFCATONSNGTES IN ACCORDANCE WITH + EXISTING SURFACE SPOT LEVELS.
CUT EVERY SECOND WIRE CROSSOVER DETAIL
SECTION ~ BARRIER KERB Tu) TOOLED JOINT DETAIL 50mm CLEAR ALONG LINE DRIVEWAY PAVEMENT SECTION (SCALE 1:20) E INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
, , INDICATES TELSTRA LINE APPROX
www.dialbeforeyoudig.com.au T ALIGNMENT, BUILDER TO CONFIRM
oN EXACT LOCATION PRIOR TO WORKS
¥, CONTRACTOR TO TOPSOIL AND TURF ANY
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
Uf . DIAL1100 COMMENCING WORKS ON SITE. ALL SERVICES ARE FE ARON AEE core rucTON ae W INDICATES WATER MAIN APPROX
BEFORE YOU DIG
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
CONSTRUCTION NOTES
GENERAL:
1. DO NOT SCALE FROM THIS DRAWING.
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL
DRAWINGS ARE TO BE REFERRED T0 THE ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE
DIAGRAM.
6. THE BUILDER MUST PROTECT ALL EXISTING NEIGHBOURING
STRUCTURES/BUILDINGS THROUGHOUT THE WORKS, PARTICULARLY DURING
EARTHWORKS. REFERENCE SHOULD BE MADE TO OUR CRITICAL DEPTH LINE
DIAGRAM OR SEEK GUIDANCE DIRECTLY FROM THIS OFFICE
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY FINISHED
TREATMENTS, EG. STAMPING
4. CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
5. CONCRETE N32 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH.
7. EXPANSION JOINTS TO BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH
WIRE CUT ALONG JOINT.
8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
9. FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF
CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR 10
WORK COMMENCING
FILLING NOTES:
—THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE IS TO BE PROOF ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7 BLOWS
PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER FOR A DEPTH
OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF COMPACTION TEST RESULTS
SHALL BE PRESENTED TO SCG CONSULTING ENGINEERS FOR APPROVAL.
— UPON THE WRITTEN APPROVAL OF THE SUBGRADE PREPERATIONS BY SCG
CONSULTING ENGINEERS THE ALLOTMENT IS TO BE FILLED TO THE SPECIFIED
LEVELS.
— THE FILL MATERIAL CLEAN GRANULAR MATERIAL (LE. SAND TO A CLAYEY
SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY ORGANIC MATERIAL
AND HAVE A CLAY CONTENT OF LESS THAN 12% (PLASTICITY INDEX LESS
THAN 25%, LINEAR SHRINKAGE OF 15%). THE PROPOSED MATERIAL |S TO BE
INSPECTED BY SCG CONSULTING ENGINEERS PRIOR TO ITS REMOVAL 10
ENSURE ITS COMPATABILITY.
— THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1 CERTIFICATION
WITH A MINIMUM RELATIVE FIELD DENSITY OF 95% COPIES OF COMPACTION
TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING ENGINEERS FOR
APPROVAL.
— FILLING AND COMPACTING ADJACENT EXISITING STRUCTURES IS TO BE IN
STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND SPECIFCATIONS.
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL BE
BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN ACCORDANCE
WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%.
- ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE PREPARATION
SHALL BE REMOVED AND REPLACED WITH THE APPROVED FILL MATERIAL
COMPACTED IN ACCORDANCE WITH AS2870-1996 10 ACHIEVE A MINIMUM
RELATIVE FIELD DENSITY OF 95%.
— SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED PRIOR
TO CONSTRUCTION COMMENCING.
PAVEMENT NOTES:
1. PRIOR TO PLACEMENT OF PAVEMENT MATERIAL THE SUBGRADE IS TO BE
STRIPPED TO LEVEL. ANY ORGANIC MATTER OR DEBRIS IS TO BE REMOVED
AND REPLACED WITH APPROVED COMPACTED MATERIAL. THE SUBGRADE
SHALL BE PROOF ROLLED TO A MINIMUM OF 98% DRY DENSITY AS
DETERMINED BY COMPACTION TESTING IN ACCORDANCE WITH AS1289
2. PAVEMENT MATERIALS SHALL COMPLY WITH THE FOLLOWING MAIN ROADS
DEPARTMENT SPECIFICATION MRS11.05:
— BASE COURSE TO CONSIST OF AGGREGATE TYPE 2.3, GRADING B OR C
3. PAVEMENT MATERIAL SHALL BE EXTENDED A MINIMUM OF 150MM BEYOND
THE EDGE OF DRIVE AND SHALL BE A MINIMUM OF 100MM THICK U.N.O.
4, BASE AND SUB-BASE COURSES ARE 10 BE COMPACTED IN LAYERS NOT
EXCEEDING 150mm IN THICKNESS TO ACHIEVE 95% DRY DENSITY OR GREATER
WITH ONE TEST PER 200mm THICKNESS OF EACH LAYER.
5. ALL COMPACTION TESTING RESULTS TO BE PRESENTED TO THE ENGINEER
FOR APPROVAL PRIOR TO PROCEEDING TO THE NEXT STAGE OF
CONSTRUCTION.
Checked:
RPEQ 5835
S Richardson
1° ~~ 4:250 @ AI
1:500 @ A3
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated drawings are
copyright and are not to be used or reproduced without the written permission of
SCG Consulting Engineers.
AMEND DATE DESCRIPTION APPR.
AMENDMENTS
SSUFOR APPROVAL
SCG) consulting ENGINEERS
STRUCTURALeCIVILeGEOTECHNICAL
ABN 40 098 481 899
1/11 PROJECT AVE, NOOSAVILLE QLD 4566
Ph (07) 5455 5604 __Fax (07) 5455 5696
Title:
PROPOSED ACCESS DRIVEWAY
Project
109 GYMPIE TERRACE
NOOSAVILLE
Date: Scale: Drawn:
duly 16 AS NOTED
Rev.
°°. 26199-C2 :
DEBUILD T/A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
109 Gympie Terrace Noosaville APPLICATION .pdfRelated documentApplication case desk ↗
109 Gympie Terrace Noosaville APPLICATION .pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.