11c Church St Pomona Ecological Assessment Rev B
Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au
Performance Outcomes Acceptable Outcomes Compliant Compliance Response
2. locating development in existing 3. provides measures to allow for safe movement of fauna approved construction
cleared areas or areas of low through the site; and management plan and
ecological value over other areas to 4. provides suitable habitat replacement and replanting in landscape or
the greatest extent possible; and accordance with PSP3 Ecological Assessment rehabilitation plans as
3. incorporating siting and design Guidelines. part of an operational
measures to protect and retain AO3.2 Habitat trees, recruitment habitat trees, and roosting, works application.
ecological values and ecosystem breeding and feeding areas are protected for native fauna habitat.
processes within or adjacent to the
development site; and
4. where adverse impacts have been
minimised, any residual impacts on
ecological values are compensated
for through suitable habitat
replacement and replanting
on site in the first instance or in a
way that results in a net gain and
enhancement of the overall habitat
values of Noosa Shire.
Management of Impacts AO4.1 Vegetation is protected from disturbance or damage from Yes Where practical native
PO4 Development provides for effective construction and operation activities by: vegetation to be retained
measures during construction and 1. clearly marking trees to be retained with flagging tape; is done in reference to
operation to protect ecological values 2. installing protective fencing around the dripline of AS4970 ± Protection of
including: the vegetation and avoid filling and excavating in these trees on development
1. avoiding disturbance to fenced areas; sites. During any site
or clearing of vegetation in and 3. ensuring stockpiling, storage and vehicle parking occurs activities including
within the vicinity of the site; outside the identified vegetation areas; and operational works a No
2. managing habitat disturbance and 4. using low impact construction techniques Go zone should be
physical harm to fauna from noise, around vegetation. established to delineate
vibration, dust, light, dewatering or AO4.2 Vegetation which is capable of forming or contributing to a the riparian buffer zone
excavating; and buffer between different land uses or a buffer against pollution, from remaining sections
3. avoiding clearing in areas where light spillage or noise is retained. of the site. Lighting
erosion or slippage could occur. AO4.3 Lighting associated with development: design in proximity and
1. does not contribute an unacceptable level of illuminance facing the riparian buffer
(greater than 1 lux) for light sensitive species within or at zone incorporates
the boundary of an ecologically important area; and approved low lux lighting
design.
Page 14
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.