Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

11c Church St Pomona Ecological Assessment Rev B

of 99

Page text read automatically using OCR, there may be inaccuracies

Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au


 Performance Outcomes                            Acceptable Outcomes                                                       Compliant   Compliance Response
      2. locating development in existing            3. provides measures to allow for safe movement of fauna                          approved construction
         cleared areas or areas of low                   through the site; and                                                         management plan and
         ecological value over other areas to        4. provides suitable habitat replacement and replanting in                        landscape or
         the greatest extent possible; and               accordance with PSP3 Ecological Assessment                                    rehabilitation plans as
      3. incorporating siting and design                 Guidelines.                                                                   part of an operational
         measures to protect and retain          AO3.2 Habitat trees, recruitment habitat trees, and roosting,                         works application.
         ecological values and ecosystem         breeding and feeding areas are protected for native fauna habitat.
         processes within or adjacent to the
         development site; and
      4. where adverse impacts have been
         minimised, any residual impacts on
         ecological values are compensated
         for through suitable habitat
         replacement and replanting
         on site in the first instance or in a
         way that results in a net gain and
         enhancement of the overall habitat
         values of Noosa Shire.
 Management of Impacts                           AO4.1 Vegetation is protected from disturbance or damage from             Yes         Where practical native
 PO4 Development provides for effective          construction and operation activities by:                                             vegetation to be retained
 measures during construction and                     1. clearly marking trees to be retained with flagging tape;                      is done in reference to
 operation to protect ecological values               2. installing protective fencing around the dripline of                          AS4970 ± Protection of
 including:                                                the vegetation and avoid filling and excavating in these                    trees on development
      1. avoiding disturbance to                           fenced areas;                                                               sites. During any site
         or clearing of vegetation in and             3. ensuring stockpiling, storage and vehicle parking occurs                      activities including
         within the vicinity of the site;                  outside the identified vegetation areas; and                                operational works a No
      2. managing habitat disturbance and             4. using low impact construction techniques                                      Go zone should be
         physical harm to fauna from noise,                around vegetation.                                                          established to delineate
         vibration, dust, light, dewatering or   AO4.2 Vegetation which is capable of forming or contributing to a                     the riparian buffer zone
         excavating; and                         buffer between different land uses or a buffer against pollution,                     from remaining sections
      3. avoiding clearing in areas where        light spillage or noise is retained.                                                  of the site. Lighting
         erosion or slippage could occur.        AO4.3 Lighting associated with development:                                           design in proximity and
                                                      1. does not contribute an unacceptable level of illuminance                      facing the riparian buffer
                                                           (greater than 1 lux) for light sensitive species within or at               zone incorporates
                                                           the boundary of an ecologically important area; and                         approved low lux lighting
                                                                                                                                       design.
Page 14
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022

Log in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.