Original source · versioned page text
11c Church St Pomona Ecological Assessment Rev B
Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au
Performance Outcomes Acceptable Outcomes Compliant Compliance Response
2. does not contribute to an unacceptable level of
illuminance on landward horizons along coastal areas and
known marine turtle nesting beaches.
AO4.4 Clearing of vegetation does not involve clearing that may
cause or contribute to hillslope erosion, bank erosion, or slippage
Connectivity AO5 Development is designed and operated to Yes The riparian buffer zone
PO5 Development is designed and maintain ecological linkages and maximise opportunity for is retained as part of the
operated to maintain and enhance connectivity and the movement of fauna by: development application
connectivity between and 1. ensuring protection of wildlife refuges; designed to maintain and
across ecologically important areas and 2. maintaining vegetation in patches of the greatest possible enhance natural
connecting habitat and support unimpeded size and within the smallest possible edge-to-area ratio; ecological linkages. As
and safe movement of terrestrial and 3. enhancing connectivity through planting and rehabilitation part of the operational
aquatic fauna. works, including across property boundaries, to areas of works application
national park, state forest or reserve; introduced and invasive
4. avoiding the creation of physical barriers and safety species are managed to
hazards (such as roads, pedestrian access and instream enhance existing
structures) along and within the ecological linkage; ecological linkages.
5. providing mitigation measures such as wildlife movement
infrastructure, fauna exclusion and directional fencing,
underpasses/overpasses and traffic calming devices,
signage and lighting; and
6. where offsets are necessary, delivering offsets that
support and enhance ecological linkages.
Waterways and Wetlands AO6.1 Development and clearing of vegetation does not occur Yes Development application
PO6 The biodiversity and ecosystem within: does not require clearing
values of waterways, wetlands and 1. a riparian buffer area; of native vegetation in
adjacent riparian zones are protected by: 2. a wetland area; or the riparian buffer area.
1. avoiding any new development in 3. 10 metres either side of the centre line of other waterways Landscape and
a riparian buffer area and wetland area; identified on a Biodiversity, Waterways and Wetlands rehabilitation plans will
2. retaining aquatic and terrestrial habitat Overlay Map. be prepared as part of
in riparian zones; AO6.2 Development provides for the rehabilitation of land within: the operational works
3. maintaining and enhancing wildlife 1. a riparian buffer area; application to manage
corridors and connectivity along 2. a wetland area; and introduced and exotic
watercourses and drainage lines for species.
native fauna movement;
Page 15
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.