Original source · versioned page text
11c Church St Pomona Ecological Assessment Rev B
Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au
Performance Outcomes Acceptable Outcomes Compliant Compliance Response
4. avoiding edge effects and damage from 3. 10 metres either side of the centre line of any
adjacent land uses; other waterway identified on a Biodiversity, Waterways
5. maintaining stream integrity and bank and Wetlands Overlay Map.
stability by minimising bank erosion and AO6.3 Recreational facilities (eg. playgrounds, pergolas,
slumping; barbeques) are setback a minimum of 10 metres from the top of
6. maintaining water quality through the bank of a waterway.
filtering sediments, nutrients and other
pollutants; and
7. removing pest species and replacing
them with local native species.
Waterways and Wetlands Not applicable
PO7 Vegetation within 400 metres of the
full ponded water within Lake Macdonald is
retained.
Waterways and wetlands AO8.1 Yes The development
PO8 Development on land adjacent to Development adjacent to a waterway or wetland provides that: application does not
a waterway or wetland maintains contain new lots that
appropriate extent of public access to 1. no new lots directly back onto a riparian buffer area; and back directly onto a
waterways and wetlands and minimises 2. new public roads are located between a riparian buffer riparian buffer zone and
edge effects. area or riparian zone and the proposed development public roads are
area. generally between the
proposed development
and riparian buffer.
Surface and ground water hydrology AO9.1 Development does not impact on the natural surface water Yes Proposed development
PO9 Development ensures that the natural or groundwater hydrologic regimes and this is facilitated by: is not anticipated to
surface water and ground water hydrologic 1. avoiding or minimising channelization, redirection or adversely impact natural
regimes of waterways, wetlands and interruption of flow; surface water or
hydrologically-sensitive plant communities 2. avoiding groundwater extraction; groundwater regimes.
are not adversely impacted. 3. maintaining groundwater recharge and discharge The site is not recorded
processes; to contain Groundwater
4. maintaining natural groundwater fluctuations; dependent ecosystems
5. avoiding causing ingress of saline water into freshwater (QLD Globe). Any
aquifers of wetlands; and planned disturbances
6. avoiding contaminants entering groundwater (e.g. from should be in in
runoff, effluent disposal) accordance with
Page 16
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.