Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au


 Criteria                                                           Action               Responsibility
 constructed, and operated to protect and enhance koalas and
 koala habitat and avoid adverse impacts in reference with
 Koala-sensitive design guideline: a guide to koala-sensitive
 design measures for planning and development activities
 (2020 V2). Detailed design avoids the creation of physical
 barriers and safety hazards and implements mitigation
 measures such as wildlife movement infrastructure, fauna
 exclusion from an area that is dangerous (such as Church St),
 directional fencing and low lux lighting or fixtures.
 Training and Inductions                                            Prior to the         Principal
                                                                    commencement         Contractor
 The principal contractor will ensure all site contractors are
                                                                    of operational
 made aware of their responsibilities including Fauna               works
 Management. Fauna management strategies will form part of
 site training and all inducted visitors and staff should be made
 aware of the project contact details and who to report to if
 potential breaches of site conditions.
 No Go Zones                                                        Installation prior   Site Supervisor
                                                                    to operational
 Prior to the commencement of site activities, the applicant
                                                                    works
 must delineate the limits of access and disturbance identified
 in the approved site plans. To minimise impacts and conflicts
 between native animals and potential habitat, vehicular
 movement and access during construction and site access
 should be controlled via minimal entry and exit points. Within
 the No Go zone, the following activities are not permitted:
 storage and mixing of materials and waste, vehicle parking,
 machinery repairs and/or refuelling, stockpiling of soil, rubble
 or debris, any filling or excavation unless otherwise approved.
 Only approved weed management, landscape and
 revegetation works or fauna catcher spotter activities are to
 occur beyond the delineated areas. Safe koala movement
 measures are implemented in No Go Zones to reduce threats
 to koalas and enable the safe movement of koala and provide
 opportunities for koalas to feed, disperse and seek refuge. No
 Go zones shall be reinstated immediately if damaged during
 operational works. No Go zones will remain until the
 completion of all bulk earthworks.




Page 22
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022

Log in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.