11c Church St Pomona Ecological Assessment Rev B
Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au
Criteria Action Responsibility
Fauna Catcher Spotter No more than Principal
one week prior contractor and
A pre-operational works survey and must be undertaken by an
to operational authorised
authorised fauna spotter catcher who holds relevant permits. works Fauna Catcher
Spotter
The survey must include a full list of fauna species
encountered during the site survey and outline relocation
options if required. The reports will be sent to the principal
contractor and proponent prior to the operational works
commencing.
Operational Works
Monitoring and Reporting Daily Site Supervisor
Inspections
The site will be monitored by an approved fauna catcher
spotter during vegetation removal or significant disturbances
for fauna, habitat disturbance or any signs of vegetation or
biotic stress. Where any site staff or visitors witness or locate
distressed, injured, or orphaned animals on the site, they
should immediately stop works and contact the Fauna Spotter
Catcher. All native animal fatalities must be reported
immediately to the Department of Environment and Science as
soon as reasonably practicable
Erosion and Sediment Control Continual Principal
Action Contractor and
Sediment and suspended solids can have substantial
Site Supervisor
ecological impacts. particularly in the stream orders observed
onsite in proximity to potential disturbances. Water with a high
level of sediment restricts plant respiration and can disturb
habitat and feed behaviours of fauna. Sediments also have the
potential to cover aquatic eggs (e.g. invertebrates, fishes and
frogs). Erosion and sediment control should be undertaken in
accordance with approved and accepted measures for the site
and avoiding the increased conveyance of stormwater and
sediment to adjacent waterways and wetlands.
Sequence and Schedule of Works Operational Principal
Works phases Contractor and
During the operational works phase, there is likely to be an
Site Supervisor
increase in noise, vibration, and light as a result of construction
activities. Some of the impacts of noise, vibration and light will
be temporary and no vehicles or machinery used for
operational works or disturbances of any kind shall occur on-
site between councils approved timeframes. Works should be
sequenced to minimise disturbances including entrapment
Page 23
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.