55 DOONELLA STREET, TEWANTIN
Landscape Plan Package
Drawing Schedule · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan prescribed 4.0 Planting 5.0 Maintenance Tasks
proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf
· Clear and remove all non-organic, deleterious and large organic matter such as rocks greater New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement
LD1 Drawing Schedule, Specifications than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. · See 1.0 Topsoil for cultivation and topsoil requirements. with Owner.
LD2 Finishes and Planting Schedules · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall · Spread ameliorated site topsoil or A.S. 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering
percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately)
LD3 Details providing a natural appearance with no abrupt edges. Trim topsoils for gardens and turfing 2% · Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry
LP1 Planting Plan minimum slope away from all structures to pits or swales. · Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep (unless it rains adequately).
settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched · Once a week there after.
Landscape Specifications 2.0 Landscape Construction areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · If turf sprinklers are installed, check turf rotor head radius once per month to ensure spray
· All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds head layout provides head to head coverage - adjust as required.
These landscape plans must be read in conjunction with the appropriate statutory approvals and Levels (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. Mowing
Australian Standards and with the Operational Works Landscaping Decision Notice once issued. · See plan for engineer's plan levels and proposed levels. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation and/or
These plans have been developed to comply with Council's Planning Scheme-Landscape Code. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Tree Planting 50mm high. Do not remove more than 31 of grass height at any one time.
discrepancy occurs notify superintendent and/or LA. · Refer to street tree and tree planting details (as applicable) for information. · Mowing Thereafter - 40mm H remaining 11 weeks then 25mm thereafter. Mow once a week
1.0 General Notes · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. · All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this during summer, once every two weeks in spring and autumn, and once a month in winter or as
· Grade evenly between prescribed levels and finish surface levels ensuring positive drainage specification. required if there is a lot of growth or as desired.
Abbreviations and no ponding areas. · Landscape contractor to peg street tree positions for approval by superintendent before Topdressing
· A.S. - Australian Standards · DBH - Diameter at breast height (1.4m) · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled excavation. · When lawn areas have become established, and immediately after the first cut, top-dress lawn
· E.P. - Establishment Period · H.D. - Hot Dipped turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · All trees to have a full and even crown. lightly to a depth of 10mm with a light sandy loam-based topsoil. Rub the dressing well into the
· LA - Landscape Architect · MP - Maintenance Period design and finish levels. · Install trees at locations indicated on the plans, per notes and details herein. joints and correct any unevenness in the turf surface. Topdressing is not to be carried out
· MPA - Megapascals · m² - square metre · m³ - cubic metre · Co-ordinate establishment of levels with superintendent. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified during the winter months.
· NATA - National Association of Testing Authorities · N/A - Not applicable 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. Weed Removal: As required to reduce competition and seeding.
· O.C. - On centre · PE - Pool Equipment · S - Spread Drainage · Edge trees per details. Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen,
· NC - Noosa Council · typ. - Typical · All damaged stormwater pipes are replaced and relocated as necessary. · Tree staking - per details. with plants of the same species and of similar size and quality unless otherwise specified.
· uPVC- Unplasticised Polyvinyl Chloride · VPZ - Vegetation Protection Zone · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · All trees to be located minimum; Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and
buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before - 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing guying when instructed by the superintendent.
· These plans are not for tender or construction. There are no existing trees to be removed. continuing works. for service setbacks) or as dimensioned on plans, from underground services (confirm Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are
· Drainage works to correlate with and not disturb adjacent land. locations on-site prior to pit excavation) and stormwater pipes established or Off-maintenance respectively.
Preliminaries · See legend for plan symbols and plans for locations. - 1500mm from concrete paths and pavement profiles, horizontally and vertically from Monitoring: Provide a monthly report on completed tasks.
· Refer to plans by others for all services locations, footpath works, levels (other than those · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped sewer lines, and property connections
indicated on these plans) and boundaries. All services and related infrastructure including galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements - 2m from stormwater catch pits Warranties
street lighting shown on these plans are indicative only. on-site in addition to those on plans. - 3m from fire hydrants, driveway crossovers, adjoining, new, or perpendicular lot · Warranties or guarantees specified shall name the Owner as warrantee. Register with
· Call 'Dial Before You Dig 11 00' prior to any excavation. · All drainage pits and subsurface drains to be connected to existing stormwater drainage boundaries manufacturers as necessary. Retain copies delivered with and components and equipment to
· Before work commences the subcontractor is to organise a pre-start meeting with the LA to system. Refer engineer's drawings for drains and hydraulic services. the Owner.
establish scope of works management procedures and clarify any issues. · Stormwater drainage to be Ø100mm minimum uPVC SN8 AS 1260.2017 solid drainage pipe. General Planting · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within
· Install tree protection measures as per plans and detail. · Subsurface drainage to be Ø100mm minimum black slotted HDPE AS2439.1 pipe centred in · Refer to detail(s) herein respectively. fourteen (14) days after practical completion.
· Prior to commencing construction works, verify dimensions, levels and location of site 300mm x 300mm gravel trench. Gravel to be Ø6 - 10mm No-fines aggregates surrounded by · Supply and place plants according to plant schedule, plant setout notes and plan locations. · Commence Warranty periods at practical completion or at acceptance of installation, if
services, refer engineer's drawings generally. LA approved permeable bidim or geotextile fabric. See Detail(s) for more information. · Where discrepancies occur advise superintendent prior to planting. acceptance is not concurrent with practical completion.
· Dimensions take precedence over scale. · Furnish and install 1m³ of Ø75mm - 150mm washed, sound, rounded Mary River · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated · If installation is not by manufacturer and product warranty is conditional on the manufacturer's
· Contractor to review all schedules herein to confirm their correlation to these plans. Where gravel cobbles / spalls over pinned permeable geo-fabric at all new landscape drainage on plans. approval of the installer, submit the manufacturer's written approval of the installing firm.
discrepancies occur within landscape documentation refer to LA prior to provision of tender daylight points. · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups
pricing and/or construction. · Where and if additional drainage is required the following applies: to achieve optimum cover related to mature plant size and form. Deliverables
- Allow for seepage interception sub-surface drainage where paths and landscape works · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, · Warranties
Erosion and Sediment Control impede drainage (to be coordinated on site). garden edges and paths to allow for mature plant form. Confirm with LA which require more · Irrigation System As-built plans in .dwg and PDF formats
· The landscape contractor to implement and maintain for the contract duration, best practice - Allow for 300mm x 300mm gravel trench with Ag-line under path, discharge to natural distance.
erosion and sediment control measures in accordance with the manual for erosion and drainage lines. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate Certifications
sediment control (Maroon Manual), good environmental practice and the consulting civil - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. Furnish LA with the following certifications prior to Practical Completion:
engineer's specification for erosion and sediment control. Penalties and fines for of low point. Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. · A.S. 2303:2018 Tree Stock for Landscape Use
non-compliance will apply. · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. · A.S. 4419 Topsoil
· Install silt control fencing in accordance with site environmental management plan and local Fencing · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · A.S. 4454 Mulch
authority regulations. · Supply and construct fencing per plans, details, and Finishes Schedule. notify superintendent and correct drainage. · Turf
· Sediment and erosion control devices to be installed where necessary and as directed on site · Soak plants thoroughly before removing from container.
by superintendent. Edging · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted Sources
· All sediment and erosion control devices are to be installed in accordance with manufacturer's · Supply, install, and maintain edges as specified and shown on the plans and details and and coiled roots to expose young roots. All stock to be free of structural defects above and · Survey: Skyline
specifications. Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie below soil line (i.e. no girdled roots). · Architecture: arco eco
· The contractor is responsible for ensuring sediment and erosion control devices are inspected off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · Do not mix soil from hole with mulch and do not compact plant pit. · Civil Engineering: Recor
and maintained as follows; · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported
a) During construction: Daily during dry weather, prior to predicted storm events, twice 3.0 Irrigation - If Installed A.S. 4419 topsoil.
daily during prolonged rain · Water plant in well and maintain soil moisture levels through E.P.
b) During establishment period: Weekly during dry weather, prior to predicted storm Preliminaries
events, twice weekly during prolonged rain · Liaise with relevant Noosa Council authorities and obtain any approval as required. New Turfed Areas
· All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Comply with government standards and co-ordinate with other trades.· · See 1.0 Topsoil for cultivation and topsoil requirements.
control of runoff. · Check locations of penetration/conduits and install where required. · Trim topsoil, fill depressions and provide even falls as indicated on drawings.
· Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Contractor to provide qualifications and insurances before construction. · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials,
compatibility and consistency in control measures. · Irrigation system is a 'Design + Build' system. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and
· All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to
Provide: laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow
Site Works · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, unimpeded over laid turf to low area respectively.
· Remove all unwanted material, deleterious and operational debris from site. rain sensor, backflow preventer per Council standards with a stainless steel enclosure, · Supply and lay 'A' grade turf per plans and schedules.
· If provided levels are not functional refer to the site superintendent and/or LA. isolation valves, pressure regulator(s) as required, Irritrol System control valves for drip, check · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is
· Civil engineering designs have provided a positively drained site. If there are drainage issues valves, black plastic valve boxes, looped mainline, thrust blocks (as required), fittings, and drip well established.
refer site superintendent. lines and emitters for gardens. If sprinklers are installed for turf areas (i.e. overhead spray), · Water turf in well and apply water to maintain soil moisture until established.
· Refer to 2.0 Landscape Construction - Drainage for more information. sprinklers / rotors shall be Hunter or LA approved equal.
· Turf area irrigation to have head to head coverage and no overspray onto hard surfaces.
Conduits Check head radius once per month to ensure spray head layout provides head to head
· Furnish and install 2 - 150mmØ solid A.S. 1260:2017 uPVC SN8 or SN10 piping coverage.
perpendicularly under all footpaths that bisect landscape areas for irrigation and landscape · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface
drainage purposes. Extend ends 300mm beyond paths, each side and cap (do not glue caps). construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to
Mark and install recycled surveyor's pegs at end caps for identification. conduits) and install used survey pegs at ends for reference.
· All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular
Topsoil - Harvesting, Stockpiling, Amelioration, Re-use and Spreading to surfaces.
· Harvested and stockpiled site topsoils if practical and reinstall per the following specifications · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines.
in respective landscaping areas. · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths
· Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of / hard surfaces as possible.
preserved vegetation driplines. · Do not irrigate road reserve areas.
· Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer · For practical completion ensure whole system is operational.
or owner which will not hinder visibility for inspection of the work. · Irrigate plants and turf ensuring adequate plant moisture is maintained during establishment.
· Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with · Adjust system post establishment so it operates during dry and hot periods so plants and turf
results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape areas are adequately watered to maintain healthy and vibrant conditions.
contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and
by a NATA accredited lab. materials for system from date of practical completion.
· Should amended site topsoils be insufficient in quantity, contractor to import AS4419 topsoil · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the
and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have controller door for reference when applying for practical completion clearly showing main-line
soils analyses test as per above. Amend Imported soils per test results prior to spreading. runs and sizes, valve types / station numbers / valve design pressure, head types and
locations.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2340 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 55 Doonella Street, Tewantin, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD1 Drawing Schedule, Specifications E: [email protected]
29.06.23 A For Application BB BB
Sheet Title Sheet 1 of 4 Client: Rowan Anderson W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 3
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity SC6.3.4.1-3 species, Native, Notes
Hardscape Trees
STE Garden Edge Galvanised Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including tapered 300mm stakes. Install per manufacturer's Formboss, local representative: BAN int BANKSIA integrifolia -Coastal Banksia 45 L 1 Yes
specifications. Refer to Specifications and Detail. Set edging 25mm into property when adjacent to road Tranquil Building and
reserve boundary. Landscapes Shrubs
07 5497 8774
ALP cae ALPINIA caerula - Native Ginger 140mm 31 Yes
Garden Steppers Concrete Garden Steppers Size: 400mm x 400mm x 40mm H Nominated by contractor and
Colour: To match primary architectural colour approved by superintendent BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 6 Yes
Finish: Set level over 95% compacted subgrade, flush to finish grades with adjacent gravel surfaces 10mm lower.
BLE car BLECHNUM cartilagineum - Gristle Fern 140mm 4 Yes
Softscape
BLE sil BLECHNUM gibbum 'Silver Lady Fern' 140mm 6 Yes
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and
import A.S. 4419 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or approved by superintendent. CAL gbf CALLISTEMON 'Great Balls of Fire' 200mm 7 Yes
areas. Provide soil testing results for topsoil and A.S. 4419 topsoil. Refer to details.
certification to Landscape Architect. COR rub CORDYLINE 'Rubra' 200mm 22 Yes
Gravel Mulch Gravel mulch with pavers and around pits Install Ø40-70mm decorative gravel mulch, 150mm deep presenting 100% cover over pinned geo-fabric. Mulch colour Nominated by contractor and LEP liv LEPTOSPERMUM liversidgei - Olive Tea Tree 140mm 2 Yes
to match secondary architectural colour and kept 50mm away from plant stems. approved by superintendent
SYZ hin SYZYGIUM australe 'Hinterland Gold' 200mm 7 Native
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent
Groundcovers
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and
CIS ant CISSUS antarctica - Kangaroo Vine 140mm 2 Yes
approved by superintendent
JUN usi JUNCUS usitatus - Common Rush Tubes 20 Yes
LOM ver LOMANDRA 'Verday' 140mm 38 Native
VIO hed VIOLA hederacea Tubes 27 Yes
TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy, weed and pest free
Note: The site's Queensland Government Vegetation Management Pre-clear Regional Ecosystem (RE) is; RE 12.2.5
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2340 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 55 Doonella Street, Tewantin, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Finishes and Planting Schedules E: [email protected]
29.06.23 A For Application BB BB
Sheet Title Sheet 2 of 4 Client: Rowan Anderson W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
Determining the Radius of the TPZ (Tree Protection Zone)
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with A.S. 4970-2009 NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
3x Tube Ø
1800
Full and even crown, typical
Tubestock plant as specified
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes to be
driven vertically into ground outside of the
Fluorescent orange 5.5k.g 50mm wide hessian tree ties rootball and shall have a finished height lower
Form shallow saucer shaped depression
barrier fencing mesh secured wrapped loosely around trunk, than the tree's lower lateral limbs
around plant base
/ tied 100mm below top of star then a figure 8 and secured to
Measurement pickets at 300mm centres stake with galvanised nails or
taken for DBH Form shallow saucer shaped depression
staples. Position tree tie between
Yellow plastic capped around base of plant and keep mulch 50mm
100mm deep organic mulch as specified,
Fencing 1/3 to 1/2 overall height of tree.
star pickets from trunk base
minimum 50mm clear of plant stem
Vegetation to 1200mm painted yellow
1.4m
100mm deep organic mulch as specified.
be protected Ameliorated site topsoil as specified, avoid
Mound mulch at edge of plant pit to collect
Ground line compaction, typical
water to fall down edges of plant pit.
Crown DBH
600mm
TPZ Turf as specified
150mm deep cultivated subgrade, typical
NOTES:
· Protective fencing to be installed around the TPZ to the commencement of any site works
Slow release fertiliser as specified. Use
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with Tree pit to be excavated to nominal depth of
phosphorus free tablets for Banksia,
A.S.1319. 600mm. Backfill hole with 100% friable
Callistemon and Grevillea species.
Slow release fertilizer
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots ameliorated site topsoil firming progressively.
as specified
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project All excavated fill to be removed off site. Scarify
Arborist in accordance with A.S.4970-2009 all sides of plant pit, typical. Subgrade
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by 100mm deep uniform gravel layer. Provide
appropriate use of herbicide clean connection to road drainage as advised
· TPZs to be monitored, inspected and certified by the project Arborist on site by civil engineer.
· Removal of tree protection measures at practical completion or as indicated by the project Arborist
1 Tree and Vegetation Protection Detail N.T.S. 3 Tree Planting - in Garden or Turf 1:30 5 Tubestock Planting N.T.S.
LD3 Typical Detail LD3 Typical Section LD3 Typical Section
Plant pit 2x width of respective pot. 2x pot Ø Shrub / groundcover / tufty
Scarify all pit walls and bottom, typ. grass plant species per plan 600mm
Pot Ø typical
Backfill plant pit with specified 100mm deep and settled organic
topsoil, avoid compaction, typ. mulch as specified, keep minimum
50mm from plant stem. Form shallow
dish drain to base of plant, typ. Varies,
Garden topsoil as specified,
avoid compaction, typ. refer
Turf as specified Plans
150mm Topsoil as specified
100mm, typ.
Metal Edging as specified Slow release fertiliser as specified.
2x rootball depth, typ. Use phosphorus free tablets for
Banksia, Callistemon and Grevillea
100mm mulch as specified species.
Tapered Edging Stake as specified
150mm, typ. 150mm deep cultivated
300mm Topsoil as specified subgrade, typ.
150mm cultivated subgrade, typ.
Existing subgrade, typ.
Existing subgrade Road Back of kerb or hardstand Turf Roll, typical
2 Metal Garden Edge N.T.S. 4 Potted Shrub, Groundcover Planting 6 Turfing
LD3 Typical Detail LD3 Typical Section Detail N.T.S. LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2340 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 55 Doonella Street, Tewantin, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
All dimensions in millimetres unless noted otherwise.
LD3 Details E: [email protected]
29.06.23 A For Application BB BB
Sheet Title Sheet 3 of 4 Client: Rowan Anderson W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 5
Doonella Street Planting Plan Legend Detail
Overhead Electric Service
OE Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
STE STE STE STE STE
Telecom Service
T
STE
Refer to plans by others to confirm locations and
locate on-site prior to commencing works
2 CAL gbf
7 MYO eli
5 CAL gbf Water Service
15 MYO eli W Refer to plans by others to confirm locations and
STE
7 LOM ver locate on-site prior to commencing works
8 LOM ver Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
7 COR rub Existing Vegetation to Remain 1
Refer to Detail
8 COR rub LD3
2 LOM ver 14 ALP cae
7 COR rub 1
17 LOM ver 1 Tree Protection Fencing
27 VIO hed FT Refer to Specifications, Detail LD3
17 ALP cae
Garden Steppers
Refer to Specifications and Finishes Schedule
4 BLE car Gravel Mulch
Refer to Specifications, Finishes Schedule, Details
5 SYZ hin
Steel Garden Edge 2
E
ST Refer to Specifications, Detail LD3
1 CIS ant
Trees 3
Refer to Specifications, Plant Schedule, Detail(s)
LD3
6 BLE sil
1 CIS ant
Shrubs 4
Refer to Specifications, Plant Schedule, Detail LD3
Groundcovers 4, 5
4 LOM ver
Refer to Specifications, Plant Schedule, Detail LD3
Turf 6
Refer to Specifications, Plant Schedule, Detail LD3
STE
2 SYZ hin
S
STE
STE
S
S 1 LEP liv
STE
S 7 JUN usi
S
STE
STE
S
STE STE
STE
6 BAC myr STE S
STE
STE
1 BAN int S
1 LEP liv
S
13 JUN usi
S
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
Scale in metres See Sheet LD2 for Schedules
Contour Interval: 200mm (e), 100mm (d)
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2340 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 55 Doonella Street, Tewantin, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services Do not scale from PDF plans. M: +614 7705 5222
(underground and overhead) from the responsible authority All dimensions in millimetres unless noted otherwise.
LP1 Planting Plan E: [email protected]
29.06.23 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 4 of 4 Client: Rowan Anderson W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North