Original source · versioned page text
planning report BDH - eumundi noosa rd v2
4.2 Engineering and Servicing The site is connected to all existing services and a detailed operational works submission will be prepared as part of a subsequent application process. A previous preliminary stormwater design was provided by SCG Engineers outlining how stormwater is to be directed under the driveway and back to Eumundi Noosa Rd. This plan is to be updated as part of the subsequent Operational Works approvals based on the new plan to include recent survey and finished levels. The preliminary plans demonstrate general compliance with the works codes, subject to further Operational Works detailed assessment. 5.0 State assessment and other matters 5.1 State interests 5.1.1 Matters established in the Planning Regulation There are no relevant matters applicable to the application. 5.1.2 State Planning Policy The SPP includes assessment benchmarks that may be applicable where a local government planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately integrates all SPP provisions, except for Natural Hazards, risk and resilience – coastal hazards – in part (not applicable to this application). 6.0 Conclusion This application seeks a Development Permit for Material Change of Use for Medium Impact Industry at 170 & 174 Eumundi Noosa Rd, Noosaville. The proposal is Code assessable development under The Noosa Plan. The Planning Act 2016 prescribes that a code assessment must be carried out only— (a) against the assessment benchmarks in a categorising instrument for the development (The Noosa Plan 2020); and (b) having regard to any matters prescribed by regulation. Council, after carrying out the assessment— (a) must decide to approve the application to the extent the development complies with all of the assessment benchmarks for the development; and (b) may decide to approve the application even if the development does not comply with some of the assessment benchmarks; and Examples— 1 An assessment manager may approve an application for development that does not comply with some of the benchmarks if the decision resolves a conflict between the benchmarks. Page 13 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.