Erosion and Sediment control checklist and calcs · OPW19/0098
Attached to the e-mail Operational Works application OPW19/0098 - Cover Letter - DA Form 1 - Site Plan - Erosion & Sediment Control checklist - Acid Sulfate Report - Civil Plans - 64 Gateway Drive Noosaville -.
4. Volume of Sediment Basins, Type D and Type F Soils
Basin volume = settling zone volume + sediment storage zone volume
Settling Zone Volume
The settling zone volume for Type F and Type D soils is calculated to provide capacity to contain all
runoff expected from up to the y-percentile rainfall event. The volume of the basin's settling zone (V) can
be determined as a function of the basin's surface area and depth to allow for particles to settle and can
be determined by the following equation:
V = 10 x Cv x A x Rx-day, y-%ile (m3)
where:
10 = a unit conversion factor
Cv = the volumetric runoff coefficient defined
as that portion of rainfall that runs off as
stormwater over the x-day period
Rx-day, y-%ile = is the x-day total rainfall depth (mm) that
is not exceeded in y percent of rainfall
events. (See Sections 6.3.4(d), (e), (f),
(g) and (h)).
A = total catchment area (ha)
Sediment Storage Zone Volume
In the detailed calculation on Soil Loss Classes 1 to 4 lands, the sediment storage zone can be taken as
50 percent of the settling zone capacity. Alternately designers can design the zone to store the 2-month
soil loss as calculated by the RUSLE (Chapter 6.5.3(d). However, on Soil Loss Classes 5, 6 and 7 lands,
the zone must contain the 2-month soil loss as calculated by the RUSLE (Chapter 6.5.3(d).
Place an "X" in the box below to show the sediment storage zone design parameters used here:
50% of settling zone capacity,
x 2 months soil loss calculated by RUSLE
. Average Depth of basin = 0.25 metres
Total Settling Sediment Total Basin shape
catchment zone storage basin
Site Cv Rx-day, y-%ile
area volume volume volume L:W Length Width
(ha) (m3) (m3) (m3) Ratio (m) (m)
Basin 1 0.54 54 0.873 255 15 270 3 56.9 19.0
0.54 3
0.54 3
0.54 3
3
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Erosion and Sediment control checklist and calcs.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.