Council archive · source document
Erosion and Sediment control checklist and calcs · OPW19/0098
Attached to the e-mail Operational Works application OPW19/0098 - Cover Letter - DA Form 1 - Site Plan - Erosion & Sediment Control checklist - Acid Sulfate Report - Civil Plans - 64 Gateway Drive Noosaville -.
1. Site Data Sheet
Site Name: Gateway Drive
Site Location: Noosaville
Precinct: 64 Gateway Drive
Description of Site: Preliminary Earthworks
Sub-catchments
Site area Remarks
Basin 1
Total catchment area (ha) 0.873
Disturbed catchment area (ha) 0.873
Soil analysis (enter sediment type if known, or laboratory particle size data)
Sediment Type (C, F or D) if known: F
% sand (fraction 0.02 to 2.00 mm)
% silt (fraction 0.002 to 0.02 mm)
% clay (fraction finer than 0.002 mm)
Dispersion percentage
% of whole soil dispersible
Soil Texture Group F
Rainfall data
Design rainfall depth (days)
Design rainfall depth (percentile)
x-day, y-percentile rainfall event
Rainfall R-factor (if known)
IFD: 2-year, 6-hour storm (if known) 16.6
RUSLE Factors
Rainfall erosivity (R -factor) 6390 6390 6390 6390 6390 6390 Auto-filled from above
Soil erodibility (K -factor) 0.058
Slope length (m) 80
Slope gradient (%) 1.2
Length/gradient (LS -factor) 0.23
Erosion control practice (P -factor) 1.3
Ground cover (C -factor) 1
Calculations
Soil loss (t/ha/yr) 112
Soil Loss Class 1
3
Soil loss (m /ha/yr) 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Erosion and Sediment control checklist and calcs.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.