Appendix E - Geotechnical Report · MCU23/0070
Cambooya Pty Ltd Re-compaction of materials should be undertaken under ‘Level 1’ inspection and testing as detailed in Australian Standard AS3798-2007 Guidelines on Earthworks for Residential and Commercial Developments. Working platform assessments must be undertaken by a suitably qualified person (i.e., RPEQ geotechnical engineer) for large plant (e.g., cranes). 6.1.2 Temporary Batter slopes Temporary unsurcharged batters in loose to very dense sand up to 3 m vertical height should not be formed steeper than 1V:3H. Flatter batters may be required if localised instability or groundwater is encountered during construction. 6.1.3 Excavatability Cut excavations of up to about 3 m high are anticipated. Excavations within this depth range should be achievable with small to medium earthmoving equipment (i.e., 8 to 12 tonne excavators). Larger machinery will however improve production rates. Depending on the strength of cementation of the exposed indurated sand (i.e., coffee rock), ripping attachments may be required. 6.2 Foundations 6.2.1 Site Classification The site classification derived in accordance with Australian Standard AS 2870-2011 Residential slabs and footings is not directly applicable to developments of this type but can provide an indication of the likely magnitude of reactive (shrink and swell) movements associated with normal seasonal soil moisture variations; and be used for plumbing design. The site, in its state at the time of our investigation, would be classified as ‘Class ‘S’ in accordance with AS 2870-2011. The estimated characteristic ground surface movement due to seasonal moisture variation (‘ys’ value) is less than 20 mm. It should be noted that the predicted order of movement is based on the existing soil profile (i.e., no cutting or filling), and moisture content changes within soils due to normal seasonal moisture variations only (i.e., does not consider soil settlement). 6.2.2 Footing Design Conventional high-level strip and pad footings could be considered to support the proposed building. Footings should found at least 0.4 m into the underlying very dense sand, designed using an allowable bearing pressure of 400 kPa. Base on the investigation results this will mean footings up to about 1.2 m depth. Footing settlements would not be expected to exceed around 1 % of footing width for pads and strips, under serviceability loads. A geotechnical engineer must confirm the design bearing pressures during construction. Footing excavations must be dry and cleaned of any loose, disturbed, or saturated materials prior to pouring concrete. An alternative to standard footings would be the use of screw pier foundations. This option would reduce the risk of requiring deeper strip and pad footings if the loose soils are locally deeper in some areas. If any soil conditions encountered during the footing excavations are found to differ from those noted in the geotechnical investigation, Core should be notified immediately, and an assessment of the footing excavations should be carried out to assess if changes to footing design are required. All footings should found such that they are not adversely affected by any adjacent excavations, batter slopes, trenches, or retaining walls that are not designed to support building or fill loads. J001873-001-R-Rev0 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Geotechnical Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.