Delegated Report - Code - Planning MCU22 0052 [As Published] · MCU22/0052
Geotechnical Stability
30. All works must be carried out in accordance with the recommendations contained Douglas
Partners’ Investigation Summary Report (Doc No. R.001) dated 21 December 2022.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, be generally in accordance with BAX Engineering’s Earthworks Layout Plan (dwg
No. 304-001-200, Rev. B) and be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
304-001-200 B Earthworks Layout Plan, prepared by BAX Engineering 18.10.23
304-001-300 B Overall Roadworks Layout Plan, prepared by BAX 18.10.23
Engineering
304-001-301 B Roadworks Layout Plan Sheet 1 of 2, prepared by BAX 18.10.23
Engineering
304-001-302 B Roadworks Layout Plan Sheet 2 of 2, prepared by BAX 18.10.23
Engineering
304-001-200 B Earthworks Layout Plan (As annotated by Council), 18.10.23
prepared by Bax Engineering
304-001-01 A Natural Hazard Management Report, prepared by BAX 4.11.2023
Engineers
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with
Page 16 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0052 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.