GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste
Management table is to be completed by the demolition contractor.
Damage to infrastructure
44. Any damage to footpaths, street plantings, natural vegetation/trees kerb
and channel, bridges or roadways must be repaired or reinstated to at least
pre-existing conditions.
Vacant site
45. The site must be left clean and tidy free from debris such as concrete, wire,
rubble, brick/s and the like. If the site remains vacant for more than 30 days
the lot/s must be turfed or landscaped in accordance with Planning Scheme
Policy PSP 2 – Landscaping and to the satisfaction of Council so as to not
cause nuisance to the surrounding area.
46. All waste materials must be removed from site.
Litter, erosion and sediment control
47. Litter, erosion and sediment control measures must be installed and
maintained until soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to
deposit or potentially allow litter, waste, soil, or other contaminants to enter
a waterway or storm water drainage system (e.g. roadside gutter).
Asbestos
48. Removal of building materials containing asbestos must be undertaken by
a licensed asbestos removalist.
49. Asbestos removal work (Section 466) of the Work Health and Safety
Regulation 2011 requires a licensed asbestos removalist to give notice to
Workplace Health and Safety Queensland (WHSQ) of licensed asbestos
removal work at least five days before the work commences. Notification
must be made using Form 65: Notification of licensed asbestos removal
work, demolition work or emergency demolition.
50. All building materials containing asbestos products are wrapped and
disposed of in accordance with the Public Health Regulation 2006 and the
Environmental Protection Regulation 2008.
Page 11 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.