2021-02-15 General Committee Meeting Minutes

of 62

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                           15 FEBRUARY 2021


                  i)      it is acknowledged that the preliminary Construction Management
                          Plan will be a draft document requiring finalisation upon appointment
                          of the Principal Contractor employed to construct the works and a
                          final document will be required to be submitted at the Pre-Start
                          Meeting for the project.
            DEMOLITION
                  Performance Bond
            41.   Security in the form of a cash bond or trading bank guarantee to the sum
                  of $10,000 must be submitted to Council’s Building and Plumbing Services
                  prior to the issue of a Development Permit for Building Works for
                  demolition, to secure the demolition conditions of this approval. The cash
                  bond or trading bank guarantee will be returned on performance of the
                  demolition conditions of this approval less any costs incurred by Council in
                  respect of enforcing performance of these demolition conditions. Council
                  reserves the right to call upon the bond or guaranteed sum to effect
                  compliance with conditions.
                  Works
            42.   Demolition must be undertaken in a manner that causes no detrimental
                  effect upon the amenity of the neighbourhood by reason of the creation of
                  excessive noise, lighting, air-borne hazards, atmospheric pollutants
                  (including dust or odours) nuisance or any other emissions in accordance
                  with the nuisance provisions of the Environmental Protection Act 1994.
                  Waste management
            43.   A Waste Management Plan (demolition) must be submitted in accordance
                  with Planning Scheme Policy PSP10 - Waste Management and approved
                  by Council’s Waste Coordinator prior to issue of a development permit for
                  Building Works for demolition, removal or relocation.
                  The purpose of the Waste Management Plan is to facilitate the segregation
                  of waste for the effective reuse and recycling of such materials. Segregated
                  wastes attract significantly reduced disposal fees at the landfill with some
                  items free. Higher gate fees are charged for mixed waste.
                  Waste storage areas must provide for adequate separation of all reusable,
                  recyclable and waste materials. These must be located so that they are
                  convenient and safe to use.
                  The Plan must contain the following information:
                  a.      The areas for the storage and separation of waste shown on a site
                          plan;
                  b.      A waste management table as indicated below is to be completed
                          showing how waste material is to be segregated - recycled – reused
                          or disposed; and
                  c.      Table – Waste Management Table
                       MATERIALS ON-SITE             DESTINATION
                                                     Re-use and Recycling                   Disposal
                       Expected waste   Estimated    On-site             Off-site           *specify
                       materials        volume(m³)   *specify proposed   *specify           contractor and
                                                     re-use or on-site   contractor and     landfill site or
                                                     recycling methods   recycling outlet   other disposal
                                                                                            site



                                                                                    Page 10 of 62
Log in to download the original file

2021-02-15 General Committee Meeting Minutes(PDF, 11MB).pdf · 12.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.