GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
a. be prepared by a Registered Professional Engineer of Queensland (RPEQ)
b. extend from the intersection with Falls Creek Road to the access to the
subject site
c. include vegetation (roadside and overhanging) that has potential to be
impacted by the construction activities
15. Any damage to the existing road formation as a result of construction operations
must be fully repaired at the developer’s expense:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
16. Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Construction Management
17. A Construction Management Plan must be submitted to Council at least 10
business days prior to the works commencing and must specifically address the
following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. Proposed fencing to the site during the construction phase of the
development
iii. Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
c. Works programme identifying key components of the works and their
respective durations.
d. Establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic and services and other
relevant issues.
e. Include a post out to the local residents immediately adjacent to the site,
and any persons who were at one point part to Appeal No. 897/20 advising
of the proposed development, the expected time frames and the site
contact details.
f. Include signage in prominent locations on the boundaries of the site
advising of the proposed development, the expected time frames and the
site contact details
g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
Page 20 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.