GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
5. No lights are permitted to be attached to the telecommunications facility, except
where required for aircraft hazard lighting purposes or similar.
Health and Safety
6. The development must not, at any time during the life of the development, result
in human exposure to environmental electromagnetic emissions exceeding the
current regulations, standards and/or recommendations of the Australian
Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
infrastructure must provide, at any time upon request by Council, written
certification to demonstrate compliance with this condition. The written
certification must assume:
a. a maximum number of users over the lifetime of any pole or other
supporting structure
b. full power usage
c. a maximum down tilt of antennae.
7. Warning information signs and security fencing must be provided on the site to
prevent unauthorised entry. Fencing must be set back a minimum of 2 metres
from the front boundary and must be camouflaged through the use of colours,
materials and screening vegetation to blend the fence into the visual landscape.
Colours and Finishes
8. The monopole, all associated antennas and the head frame must be finished in
pale eucalypt to assist in blending the tower visually into the landscape.
Vegetation Retention
9. The following trees must be surveyed and retained:
a. the three large trees marked as 7.1 and 7.2 on Figure NP7 of the Second
Visual Amenity Joint Expert Report dated 2 December 2020 (page 15); and
b. any tree with a trunk diameter at or wider than 200mm, in a 10m wide buffer
within the areas marked 5 and 5A on Figure NP7 of the Second Visual
Amenity Joint Expert Report dated 2 December 2020 (page 15).
10. For the purpose the development permitted under this approval, no clearing of
vegetation is permitted within reasonable proximity to the tower apart from those
trees identified on Drawing No. 4POM-51-45-CRNA-C5 Revision A prepared by
Aurecon and dated 10 January 2020.
Cessation of Use
11. The tower facility must be removed from the site upon cessation of the use.
Stormwater Drainage
12. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks
13. All earthworks and associated batters must be contained entirely within the
subject site. All earthworks must be undertaken in accordance with the provisions
of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
Damage to Services and Assets
14. A condition report of the existing formation of Tablelands Road must be submitted
to Council at least 10 business days prior to the works commencing. The report
must:
Page 19 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.