GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
26. All landscape works must be established and maintained in accordance
with the approved design for the life of the development, and in a manner
that ensures healthy, sustained and vigorous plant growth. All plant
material must be allowed to grow to full form and be refurbished when its
life expectancy is reached.
Retention of Existing Trees
27. Trees identified for retention, as shown on the Tree SRZ Layout Plan,
Drawing No. P07, Issue A, prepared by 360 Civil Consulting and dated
September 2020, must be retained.
28. All works must be carried out generally in accordance with section Tree
Protection Methodology of the Arboricultural Report and Tree Protection
Methodology / Plan report listed within this Decision Notice, with the
following amendments incorporated into the document:
a) Inclusion of a plan clearly numbering the trees in accordance with
Tree SRZ Layout Plan, Drawing No. P07, Issue A, prepared by 360
Civil Consulting and dated September 2020;
b) Details of the construction methodologies and tree protection
measures to be engaged during the construction of the retaining
walls and stairway to the south eastern portion of the lot;
c) Details of the constructions methodologies to be engaged for the
laying of the water detention cells in the tree protection zones;
d) Details of the construction methodologies to be engaged for the
decommissioning of the retaining wall and re-landscaping to the
frontage around the Melaleuca; and
e) Details of the methods to be engaged during the demolition of the
existing development.
29. The report as referenced in Condition 28, must be resubmitted to Council
incorporating the above amendments prior to the issue of any Development
Permit for Operational Works or Permit for Demolition Works.
External Works
30. Noosa Drive must be upgraded for the length of its frontage to the subject
site. The works must be undertaken in accordance with an Operational
Works approval and must include the upgrade of the existing footpath for
site’s frontage to Noosa Drive for the full width between the kerb and the
front boundary of the site. The pathway must be constructed with granite
pavers to match existing granite pavers in the general vicinity of the site
(Hastings St/Noosa Drive).
This condition is imposed pursuant to s128 of the Planning Act 2016 being
necessary trunk infrastructure identified by Council’s LGIP to service the
development.
Stormwater Drainage
31. Stormwater runoff from the development must be disposed of on-site
without causing scour or damage to the subject site or any adjoining
property. The works must be undertaken in accordance with an Operational
Works approval and be generally in accordance with drawing number P06
prepared by 360 Civil Consulting dated September 2020.
Page 7 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.