GENERAL COMMITTEE MEETING MINUTES 15 FEBRUARY 2021
Services
32. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
33. Certification must be submitted to Council from all relevant service
providers (Energex, NBN and Unitywater) which certifies that the
development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
34. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
37. All fill and associated retaining walls must be contained entirely within the
subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with
the provisions of Australian Standard AS3798: Guidelines on Earthworks
for Commercial and Residential Developments.
38. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber
surface levels must be adjusted to provide a freeboard of 100mm above
the finished ground surface level.
Damage to Services and Assets
39. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a) where the damage would cause a hazard to pedestrian or vehicle
safety, immediately; or
b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Preparation of a Preliminary Construction Management Plan
40. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a) traffic management during all aspects of the construction phase
including:
Page 8 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.