Skip to the record
The only place to find full transcripts.

Council archive · source document

Appendix C Engineering Report · MCU22/0038

of 70

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
          PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                                  RESPONSE
 Drainage
 PO1                                                        AO1                                                             Development complies with the acceptable outcome
 Finished surface levels ensure land is free                The finished surface gradient of any filled or excavated        and will be free draining.
 draining.                                                  area is within the range 0.5% to 1.5% and drains to
                                                            Council’s stormwater infrastructure where available or
                                                            where stormwater infrastructure is not available, toward
                                                            the street.
 Hydraulics

 PO2                                                        AO2                                                             Any ground level changes will not impact on site
 Any change to the level of the land does not have          No solution provided.                                           flooding or drainage characteristics.
 an adverse flooding impact on the flooding and
 drainage characteristics off-site.
 Geotechnical considerations
 PO3                                                        For assessable development—                                     Earthworks completed on site will be adequately
 Earthworks do not result in geotechnical instability       AO3.1                                                           supported and ensure the stability of the surrounding
 on the premises or nearby premises.                                                                                        land
                                                            Filling works are undertaken in accordance with Section
                                                            2.8- Filling of Site of
                                                            Council’s PSP5 - Engineering Design
                                                            Standards- Roads and Drainage & Earthworks
                                                            AND
                                                            AO3.2
                                                            Where the filling is for residential commercial or industrial
                                                            purposes the works comply with Australian Standard -
                                                            Guidelines for earthworks on commercial & residential
                                                            development.




  l:\8000-8999\8600-8699\8662\codes\10-03-22 earthworks code.docx

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C Engineering Report.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.