Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Appendix C Engineering Report · MCU22/0038

of 70

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
          PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                               RESPONSE
 Local amenity

 PO4                                                        AO4.1                                                            Development will comply with the requirements of the
 Earthworks do not cause disturbance to the                 The following control measures are implemented—                  Acceptable Outcome with regards to dust control and
 amenity of the neighbouring land.                          a) regular water spraying of exposed areas to suppress           Earthworks operation hours
                                                                 dust;

                                                            b)      provision of dust stabilised or sealed internal roads


                                                            c)      protective covering of exposed areas that are left for
                                                                    more than 2 weeks; and

                                                            d)      if there is no valid development permit for the site,
                                                                    disturbed areas are revegetated using species
                                                                    identified in PSP3 - Landscaping Plants and
                                                                    Guidelines;

                                                            AND

                                                            AO4.2
                                                            Earthworks are undertaken only during
                                                            the hours of 7am to 6pm, Monday to Friday and 7am to
                                                            6pm on Saturday. No work is undertaken on Sunday or
                                                            public holidays.




  l:\8000-8999\8600-8699\8662\codes\10-03-22 earthworks code.docx

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C Engineering Report.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.