EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
Vegetative Waste
PO5 AO5.1 Vegetation clearing is not anticipated on site.
Vegetation cleared from a development site is Cleared vegetation is transported off-site for disposal in
disposed of in an environmentally responsible an approved green waste disposal facility;
manner. OR
AO5.2
Cleared vegetation is mulched on-site and reused for
landscaping of the finished
development;
OR
AO5.3
Cleared vegetation is disposed of for the purpose of
firewood. (Note: Disposal of vegetative waste by burning
off is not an acceptable method of disposal).
Managing contamination risk
PO6 AO6.1 All fill material used on site will be clean fill.
Materials used as fill are suitable for development The fill material is solid clean earth, free of putrescible or The site is not on the contaminated lands register
of the land and filling or excavation works do not refuse material, vegetation, acid sulfate soils, building or
result in the contamination of land. construction material or other material or contaminants;
AND
AO6.2
The site is not on the contaminated land register.
l:\8000-8999\8600-8699\8662\codes\10-03-22 earthworks code.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.