Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 2 - Stormwater Management Plan · 131998.981126.5

of 19

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                         Callaghan & Toth

APPENIDX 1: Detention Calculation Results
                     202 Eumundi Noosa Rd Noosaville

Summary of Calculations:

Pre-Development Case

610m² Catchment

tc = 6 min., C=0.98, 0.70
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.04351 m³/s
              Q10% flow = 0.02572 m³/s
              Q50% flow = 0.01638 m³/s


Post-Development Case (With Detention)

610m² Catchment


tc = 6 min., C=0.98
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20

              Q1% flow = 0.02615 m³/s
              Q10% flow = 0.0116 m³/s
              Q50% flow = 0.0084 m³/s




                                2227 SWMP_Rev0.docx    September 2022   11
2227

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2 - Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.