Council archive · source document
Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
POST DEVELOPMENT 2 tanks noosa 2-Year Duration=6 min, Inten=153.3 mm/hr
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=20 mm
Tc=6.0 min C=0.98 Runoff=0.01880 m³/s 0.009 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=20 mm
Tc=6.0 min C=0.98 Runoff=0.00501 m³/s 0.002 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=19 mm
Tc=6.0 min C=0.90 Runoff=0.00153 m³/s 0.001 Ml
Reach 4R: DN450 SW Pipe Inflow=0.00836 m³/s 0.008 Ml
Outflow=0.00836 m³/s 0.008 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=15.904 m Storage=7.1 m³ Inflow=0.01880 m³/s 0.009 Ml
Outflow=0.00497 m³/s 0.005 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.01880 m³/s 0.009 Ml
Primary=0.01880 m³/s 0.009 Ml Secondary=0.00000 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.012 Ml Average Runoff Depth = 20 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.