POST DEVELOPMENT 2 tanks noosa 10-Year Duration=6 min, Inten=203.1 mm/hr
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=27 mm
Tc=6.0 min C=0.98 Runoff=0.02491 m³/s 0.012 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=27 mm
Tc=6.0 min C=0.98 Runoff=0.00664 m³/s 0.003 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=25 mm
Tc=6.0 min C=0.90 Runoff=0.00203 m³/s 0.001 Ml
Reach 4R: DN450 SW Pipe Inflow=0.01159 m³/s 0.012 Ml
Outflow=0.01159 m³/s 0.012 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=16.305 m Storage=9.2 m³ Inflow=0.02491 m³/s 0.012 Ml
Outflow=0.00653 m³/s 0.008 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.02491 m³/s 0.012 Ml
Primary=0.02491 m³/s 0.012 Ml Secondary=0.00000 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.016 Ml Average Runoff Depth = 27 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.