Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
POST DEVELOPMENT 2 tan noosa 100-Year Duration=6 min, Inten=295.9 mm/hr, Cf=1.20
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.03704 m³/s 0.018 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.00988 m³/s 0.005 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.00329 m³/s 0.002 Ml
Reach 4R: DN450 SW Pipe Inflow=0.02615 m³/s 0.020 Ml
Outflow=0.02615 m³/s 0.020 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=16.820 m Storage=11.8 m³ Inflow=0.03100 m³/s 0.017 Ml
Outflow=0.01944 m³/s 0.013 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.03704 m³/s 0.018 Ml
Primary=0.03100 m³/s 0.017 Ml Secondary=0.00604 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.024 Ml Average Runoff Depth = 40 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.