Council archive · source document
Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
Callaghan & Toth 1. INTRODUCTION The site subject to this report is at No.202 Eumundi Noosa Rd Noosaville. One existing shed on the lot will be removed and replaced by a larger shed and will feature a new concrete hardstand area and short section of road to link carpark areas. As well, an existing church building will be upgraded to feature a new entry foyer and covered barbeque area. The stormwater management assessment undertaken on this project considers the increase in impervious area of the lot due to the proposed shed and hardstand area. Then, it determines which measures can be incorporated into the design to attenuate the resultant increase in runoff back to predevelopment levels. The new entry foyer and barbeque area will capture stormwater and be directed to the existing site drainage system. The existing shed catchment drains to Satinwood St before discharging to Lake Doonella Bushland Reserve. The existing church building catchment drains to Ferntree Ct before discharging to a portion of Lake Doonella Park. The existing shed and church building site currently drain to Satinwood St and Ferntree Ct, respectively, as shown on Figure 1.1. The proposed new drainage system will replicate the existing catchment. 1.1 Response to Conditions of Approval TABLE 1.1: Response to Pre-Lodgement Notes Item CONDITION RESPONSE Mark Lewis -1 The proposed shed and associated hardstand areas Details shown on Figure will most likely increase stormwater runoff from the 1.2 site. Any application will need to include a stormwater management plan prepared by a suitably qualified person. The SWMP must demonstrate that the development will not cause a downstream worsening for other properties and that the downstream drainage system has the capacity to cater for the runoff. Runoff from the other smaller additions to the buildings will need to be directed to the existing site drainage system. 2. DESCRIPTION The site is on a 19,841 m2 parcel of land which has frontage to Eumundi Noosa Rd. Onsite drainage in the westerly portion of the lot discharges to an underground DN450 stormwater system on Satinwood St controlled by Noosa Council. Onsite drainage in the central portion of the lot discharges to an underground DN300 stormwater system on Ferntree Ct controlled by Noosa Council. Onsite drainage in the eastern portion of the lot discharges to an underground DN300 stormwater system that flows towards Silkwood Dr and is controlled by Noosa Council 2227 SWMP_Rev0.docx September 2022 4 2227
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.