Council archive · source document
Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
Callaghan & Toth
3. FLOODING
The existing shed drains toward Satinwood St and the Lake Doonella Bushland Reserve.
The downpipes discharge into a grassed open channel along the westerly boundary of the
lot.
The existing church building drains toward Ferntree Ct. The downpipes discharge to a pit
before entering the DN300 pipe on Ferntree.
The runoff from Eumundi Noosa Rd is collected in kerb and channel and a culvert under the
driveway. The whole lot is above flood levels.
2227 SWMP_Rev0.docx September 2022 5
2227
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.