Council archive · source document
Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
Callaghan & Toth Civil, Environmental & Hydraulic Engineers [OCR of page images] ON150 OVERFLOW PIPE TO GULLY PIT ROOFWATER DOWNPIPES ON40 OUTLET TO § GULLY PIT 3,500L STORMWATER DETENTION 2.235m = 1.405m 0.83m 1,500L TOILET WATER STORAGE FIRST FLUSH DIVERTER 5,000L TANK (ASSUME TANK IS 1.8m DIAMETER x 2.32m HIGH) project Callaghan & Toth | PROPOSED NOOSA CHURCH UPGRADES Civil, Environmental & location Hydraulic Engineers 202 EUMUNDI NOOSA RD NOOSAVILLE 1.16/90 GOODCHAP STREET NOOSAVILLE 4566 | Ph: 54749081 Fax: 54749041 www.callaghanandtoth.com.au — TYPICAL DETENTION/REUSE TANK Figure 4.2 Scale: NTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.