Skip to the record
Beware of cheap imitations.

Council archive · source document

Attachment 2 - Stormwater Management Plan · 131998.981126.5

of 19

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Callaghan & Toth
  Civil, Environmental &
  Hydraulic Engineers


[OCR of page images]
 

 

ON150 OVERFLOW
PIPE TO GULLY PIT

ROOFWATER DOWNPIPES

 

 

ON40 OUTLET TO §
GULLY PIT

3,500L STORMWATER DETENTION
2.235m = 1.405m

 

 

0.83m 1,500L TOILET WATER STORAGE

 

 

   
 

FIRST FLUSH
DIVERTER

 

 

 

 

 

5,000L TANK

(ASSUME TANK IS 1.8m DIAMETER x 2.32m HIGH)

 

 

project

Callaghan & Toth | PROPOSED NOOSA CHURCH UPGRADES

Civil, Environmental &

location

Hydraulic Engineers 202 EUMUNDI NOOSA RD NOOSAVILLE

1.16/90 GOODCHAP STREET
NOOSAVILLE 4566
| Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au

—

TYPICAL DETENTION/REUSE TANK

Figure 4.2

 

 

Scale: NTS

 

 

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2 - Stormwater Management Plan.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.