Town Planning Assessment Report
Housing choice PO3 AO3 AO3 - Not Applicable
The proposal does not incorporate
A secondary dwelling: A secondary dwelling:
a secondary dwelling.
forms part of a dwelling house and a) has a maximum gross floor
is not subdivided from the balance area of 65m²;
of the dwelling house;
b) has no more than 2 bedrooms;
contributes to housing choice for
members of the one household; c) does not occur on any property
covered by a Building Unit Plan;
protects the low density residential, and
rural residential or rural character of
the zone; d) does not occur on a property that
already contains a dual
does not occur on a property occupancy or secondary
covered by a Building Unit Plan or dwelling.
any property already containing
more than one dwelling;
is accompanied by sufficient car
parking.
Bushfire Hazard Management AO15 AO15 - Complies
PO15 Within a bushfire hazard area where
The building is located in a high
Where located in a Bushfire Hazard there is no reticulated water supply,
potential bushfire area. The
Area as shown on the Bushfire the premises has:
Hazard Overlay Map in Schedule 2 proposal complies with AO15 in
that the premises the dwelling will
and not in a water service area, an a) an accessible dam, swimming
be provided with a water tanks
adequate, reliable, safely located pool or water tank available for
which have a capacity exceeding
and freely accessible water supply firefighting purposes with an
is provided for fire fighting purposes, onsite water volume of not less 5000L and will be fitted with a
50mm diameter fitting.
which is in addition to day to day than 5,000 litres; and
water supply.
b) a water supply outlet pipe 50
millimetres in diameter and fitted
with a standard fire brigade fitting
connected to the water supply
(other than where the water
supply is in a swimming pool or
dam).
Flood Hazards AO16.1 AO16.2 - Not Applicable
PO16 Where the development is located in
The building in not located in a
Development is designed and sited the Flood Hazard Area as shown
to ensure risk to people and on Flood Hazard Overlay Map in Flood Hazard Area.
property from flooding is avoided or Schedule 2, the finished floor level is at
minimised. least 300mm above the DFE
Or
AO16.2
Where the DFE has not been modelle
d for the area, the finished floor level of
habitable rooms is at least
500 millimetres
above the highest recorded flood.
Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.