Major Electricity Infrastructure &       AO18.1                                      AO18.1 - Complies
Substations                              Development including any sensitive
PO18                                     land uses is at least:                      The building is not within proximity
Development is sufficiently                                                          of major electricity infrastructure.
separated from major electricity         a) 50 metres from a
infrastructure and substations to           transmission substation;
minimise the likelihood of nuisance
or complaint.                            b) 10 metres from any
                                            other substation; and

                                         c) 30 metres from a transmission
                                            line easement.

                                         AO18.2                                      AO18.2. - Complies
                                         Habitable buildings are not located         The proposal is not located near an
                                         within an easement for a distribution       easement for a distribution line.
                                         line.

Landslide Hazard Area                    AO22.1                                      AO22.1 - AO22.4 - Complies
PO22                                     Development, including
                                                                                     The dwelling is located outside of
Development maintains the safety         associated access, is not located on
                                                                                     mapped Landslide Hazard Areas.
of people, property and hazardous        land identified as a landslide hazard
materials stored in bulk from the risk   area on a Landslide Hazard Overlay
of landslide                             Map.

                                         AO22.2
                                         Development, including
                                         associated access, is located outside
                                         moderate, high and very high
                                         landslide hazard areas and areas with
                                         15% slope or greater, as determined
                                         by a site-specific slope-analysis.

                                         Editor's Note—A site- specific
                                         geotechnical assessment may be
                                         used to demonstrate that although
                                         the proposed development is shown
                                         on the Landslide Hazard Overlay as
                                         being in the moderate, high or very
                                         high landslide hazard area, the
                                         landslide risk is low or very low.

                                         OR

                                         AO22.3
                                         A site-specific geotechnical
                                         assessment is prepared by a
                                         registered professional engineer to
                                         certify that:
                                         a) the stability of the site, including
                                              associated buildings and
                                              infrastructure, will be maintained
                                              and operational for the life of the
                                              development;
                                         b) the site is not subject to the risk of
                                              landslide activity originating from
                                              other land, including land above
                                              the site; and
                                         c) development of the site will not
                                              increase the risk of landslide
                                              activity on other land.

                                                                                                              Page 13 of 15
Log in to download the original file

Town Planning Assessment Report.pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.