J&P Richardson Industries Pty Ltd -14-
6.0 DISCUSSION
6.1 Summary of magnetic field calculations
The key results of sections 4.3 of this report with respect to magnetic field are summarised
in Table 9 below.
Table 9 Magnetic field levels for proposed 132kV constructions
CALCULATED MAGNETIC FIELD STRENGTHS (mG)
Scenario
Easement Easement
maximum
(North) (South)
1 0.54 0.71 1.83
2 0.71 0.83 2.26
Scenario1 represents the system normal configuration with inbuilt escalation in the average
132kV line currents to account to load growth. It therefore represents a ‘future’ average
magnetic field level. Scenario 2 represents a ‘worst case’ field with both feeders in service.
6.2 Assessment of magnetic field levels
It can be seen with reference to Table 9 and Table 3 that the calculated magnetic field
levels are several orders of magnitude less-than the maximum permissible exposure levels.
It is further noted that the calculated worst case magnetic field at the edge of the easement
is less than 25% of the widely adopted industry reference value of 4mG adjacent the
proposed lots. In addition the maximum magnetic field across the easement itself (under
the powerline) is significantly less than this reference value.
6.3 Application of prudent avoidance principles
Routine consideration must be given to measures that may reduce the magnetic field levels
at the site within the scope of prudent avoidance. Even very minor cost impacts may be
difficult to justify at this particular site given the very low prospective magnetic field levels.
6.3.1 ENERGEX transmission infrastructure.
The conductor phase orientation on the two double circuit tower lines is already configured
for minimum magnetic field level.
The only other way that magnetic field levels associated with the transmission circuits could
be reduced is by altering the physical construction of the support structures – by using
more compact or taller structures, or undergrounding.
Any of these changes would have either functional or significant cost impact and therefore
not be within the scope of prudent avoidance.
Hollett Road EMF Study V1.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.