Original source · versioned page text
Attachment 5 - Document Referenced in Conditions - 2306-35006 SRA
Attached to the e-mail MCU23/0038 - SARA Referral Agency Reponse.
Provectus Algae Pty Ltd
ACN 625 465 572
5 Bartlett Rd
Noosaville, Queensland 4566
Waste Management
Minimal solid waste will be generated through the production process. Media packaging
materials will be appropriately recycled. In the event of unforeseen circumstances requiring
the disposal of algae, proper treatment will be conducted prior to discharge to ensure the
absence of viable cells.
Wastewater management is addressed separately.
Energy Efficiency
Energy-efficient LED lighting has been utilised for the lighting system for algae production.
Additional, LED lighting will be utilised throughout the entire facility, with all internal lighting
being switched off outside of operational hours.
A HVAC system shall be utilised to maintain the required process temperature range for
algae growth without excessive energy consumption. The production and lab areas utilise
cold room panelling to form an insulator. This assists with the reduction of energy
consumption required to maintain environmental conditions through the HVAC system.
Selection of an electricity plan utilising green renewable energy from wind presents various
advantages: reduced operating costs along with lowered carbon emissions; predictable and
cost-effective finances for electricity-generation; reduced costs of maintenance and fuel.
The energy efficiency performance of all equipment shall be assessed prior to selection with
preference given to items with low energy consumption. Equipment will be reviewed
periodically to assess potential technological advancements with improved energy
efficiency.
Where required, process piping is insulated and lagged to reduce energy losses.
PA actively supports the option of remote working, where practicable, to further minimise
environmental impacts.
Noise Assessment
The planned procedures will utilise closed system bioreactors that operate exclusively within
enclosed workrooms located in a fully sealed building. It is expected that the noise levels
originating from the building will not surpass background noise level, making a Noise
Management Plan unnecessary at this point. If any alterations are made to the operations,
noise levels will be monitored accordingly.
Nature, Accelerated
Email: [email protected] Website: www.provectusalgae.com
CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced,
published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this
document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority.
PA-MAN-EMS Version 1 July 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.