Original source · versioned page text
Attachment C Noosa Heads
Attached to the e-mail Cover letter, IDAS plans, Att C & D , Plans DA01.02 - DA07.02 1 of 4 MCU16/0143.
column 1 column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Compliance
development. S22.1 No solution provided
AND
O22 Physical and visual links between public
open space areas and watercourses are
retained..
Pedestrian and bicycle pathways
O23 Safe and convenient pedestrian and S23.1 Pedestrian and bicycle pathways are Not applicable -the site is within close
bicycle pathways are provided and retained provided and retained where indicated in proximity to pedestrian and bicycle routes.
between and around key destinations. Schedule 5 – Map 2;
AND
S23.2 Contributions toward a Pathways
Network are provided in accordance with
PSP20.
Recreational opportunities
O24 Key recreation focal points, including No solution provided Site fully serviced - No additional
Noosa National Park, Noosa River foreshore infrastructure required.
and mouth, Noosa Main Beach and Lion’s Park
are maintained without significant changes to
their
landscape character, including as a result of
increased infrastructure.
Watercourses
O25 The environmental, economic, amenity No solution provided Not applicable
and transportation values of the Noosa River
system are protected.
Attachment C - page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.