Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
2. ensure the development is lawful point of discharge in accordance with PSP6 The proposed development’s stormwater
adequately drained; and Engineering Design Standards - Roads, drainage and drainage system will connect to a lawful point of
earthworks. discharge where applicable.
3. ensure stormwater is managed and
lawfully discharged without altering
AO2.3 Complies with AO2.3
stormwater drainage characteristics
Stormwater flows discharging from the
external to the site. The proposed development’s stormwater flows
development are demonstrated to be consistent
will be consistent with pre-development
with pre-development characteristics.
characteristics where applicable.
AO2.4 Complies with AO2.4
Development provides for the management of
The proposed development’s stormwater
stormwater to incorporate appropriate allowance
management system will comply with required
for climate change impacts (including rainfall
standards regarding climate change impacts
intensity and sea level rise), in accordance
where applicable.
with PSP6 Engineering Design Standards – Roads,
Drainage and Earthworks.
PO3 AO3.1 Complies with AO3.1
Stormwater drainage infrastructure conveys run- Stormwater drainage infrastructure meets the
The proposed development’s stormwater
off in a manner that allows roads to deliver desired desired standards of service for roads functionality
drainage infrastructure will comply with required
standards of service appropriate to the local set out in PSP6 Engineering Design Standards -
standards regarding roads functionality where
conditions and local stormwater drainage Roads, Drainage and Earthworks.
applicable.
characteristics.
PO4 AO4.1 Complies with AO4.1
Stormwater infrastructure is compatible with The location, design and construction of
The proposed development’s stormwater
existing infrastructure, allows for easy access for stormwater drainage structures is in accordance
infrastructure will be provided in accordance with
the ongoing maintenance by Council, is cost with PSP6 Engineering Design Standards - Roads,
required standards where applicable.
effective across its design life. drainage and earthworks.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original