Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
disposed of in an environmentally responsible
AO5.2 Complies with AO5.1
manner.
Cleared vegetation is mulched on-site and reused
Any vegetation being removed will be disposed of
for landscaping of the finished development.
in an appropriate manner.
AO5.3 Complies with AO5.1
Cleared vegetation is disposed of for the purpose
Any vegetation being removed will be disposed of
of firewood.
in an appropriate manner.
AO5.4 Complies with AO5.1
Disposal of vegetative waste by burning off is
Any vegetation being removed will be disposed of
avoided.
in an appropriate manner.
Managing contamination risk AO6.1 Complies with AO6.1
PO6 Fill material is solid clean earth, free of putrescible
The proposed development will ensure any fill
Materials used as fill are suitable for development or refuse material, vegetation, acid sulfate
undertaken will use uncontaminated soil and land.
and future use of the land and filling or excavation soils, building or construction material or other
works do not result in the contamination of land. material or contaminants.
AO6.2 Complies with AO6.1
The site is not on the contaminated land register.
The proposed development will ensure any fill
undertaken will use uncontaminated soil and land.
Haulage activity and amenity No acceptable outcome provided Complies with PO7
PO7
Any haulage of material to and from the site will
Haulage of material to and from a site ensures—
ensure minimal disturbance on the surrounding
area and use identified haulage routes.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.