Original source · versioned page text
Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
Environmental protection No acceptable outcome provided Complies with PO11
PO11
The proposed development will ensure that
Earthworks minimise any adverse impact upon
earthworks will minimise any adverse impact to
groundwater, watercourses, drainage lines,
the land and surrounding environment.
wetlands, and native vegetation.
Dams AO12.1 Not applicable
PO12 Where the site is in the Rural zone—
The proposed development does not involve the
Dam location and construction does not impact
construction of a dam.
upon neighbouring properties or road reserves, in
1. the land has a slope of less than 25%
terms of—
(1:4);
2. the earthworks including cut and fill
1. hydrology;
batters and retaining walls
2. alteration of existing overland flow are setback a minimum of 50 metres
paths and patterns; from the property boundary; and
3. landslide or failure of dam wall; and 3. the size of the lot is greater than 5
hectares.
4. effluent disposal areas.
AO12.2 Not applicable
Where the site is in the Rural residential zone or
The proposed development does not involve the
the Rural zone and the lot is less than 5 hectares:
construction of a dam.
1. the land has a slope of less than 1:6;
2. the earthworks including cut and fill
batters and retaining walls
are setback a minimum of 20 metres
from the property boundary; and
3. the dam work involves less than
500m³ of material.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.